桥梁限高架施工组织设计永煤公司铁路运输处目录1工程施工模式···············································································22工程施工方案···············································································22.1开工前交底及开工准备会························································22.2钢结构制作················································································22.3现场施工····················································································32.4竣工验收····················································································33限高架施工图纸···········································································44施工安全措施···············································································74.1一般要求····················································································814.2钢轨搬动及运输安全································································84.3钢架加工安全措施····································································84.4用电安全····················································································84.5基坑施工····················································································94.6钢结构(钢轨)吊装安全························································95施工所需机具、材料···································································94.1施工所需机械、工器具····························································94.2施工所需材料············································································96工程概算·······················································································92桥梁限高架施工组织设计1工程施工模式该工程为车集线地销路立交桥、雪枫路立交桥的限高防护架施工,防护架使用43kg/m钢轨制作,由铁运处组织施工,具体分工为检修段负责按照图纸加工限高架,工务段负责限高架加工的监督和现场安装,供应科负责相关机具、材料的租用和购买。施工负责人分别为:检修段限高架制作负责人×...