目录第一章编制说明···························`···········1第二章工程概况·······································2第三章施工总体部署···································4第四章针对本工程重要及特殊过程专项施工方案···········8第五章分部分项工程施工方法··························54第六章机械设备、劳动力及材料计划····················85第七章执行强制性规范标准的措施······················87第八章质量管理及质量保证措施························98第九章确保安全生产的措施及费用计划·················116第十章施工进度计划及保证工期的措施···········`·····130第十一章施工现场平面布置···························133第十二章文明施工、减少扰民、降低环境污染···········135第十三章新工艺、新技术、新材料的推广应用···········140第十四章合理化建议及节约投资效益对比···············141第十五章降低成本措施·······························142第十六章施工配合与协调·····························144第十七章附表、附图·································1451第一章编制说明根据本项目各单位工程主要施工内容及工期均类同的特点,本施工组织设计按一个单位工程编制,施工劳动力配备计划、周转材料配备计划、施工进度计划、施工现场平面布置等均按一个单位工程配备,各单位工程施工组织及人员、材料配备计划