***********管道工程新洲路段顶管穿越方案**县水厂供水管道工程新洲路段穿越顶管施工方案编制人:审核人:审定人:山东省******工程公司2017年3月26日***********管道工程新洲路段顶管穿越方案目录(根据实际改动内容调页码)1设计依据....................................................21.1编制依据..................................................21.2设计规范..................................................21.3设计图纸..................................................22.现场踏勘....................................................23、工程概况..................................................33.1工程基本概况.............................................33.2气象情况..................................................33.3地质情况..................................................34、穿越施工方案及技术措施..........................44.1公路顶管穿越基本形式.............................44.2施工工艺流程...........................................44.3施工准备..................................................44.4测量放线..................................................54.5作业带清理...............................................64.6发送坑、接收坑开挖.................................64.7顶进系统安装...........................................64.8顶套管作业...............................................84.9穿越段管道预制........................................94.10单体水压试验...........................................94.11穿越管道就位...........................................94.12套管封堵.................................................104.13连头........................................................134.14管沟回填、地貌恢复...............................144.15附属工程施工..........................................14***********管道工程新洲路段顶管穿越方案4.16检查验收.................................................145、施工部署.................................................145.1组织机构..................................................155.2应急组织机构...........................................155.3施工人员安排..........................................155.4施工设备安排..........................................155.5施工计划安排...........................................156、QHSE管理.................................................166.1质量保证措施..........................................166.2HSE保证措施...............................................167、施工用料...............................................178、公路保护、保证措施………………………………………………………………189、质量、安全、文明施工………………………………………………………………1910、安全应急预案…………………………………………………………………………211***********管道工程新洲路段顶管穿越方案一、设计依据1、编制依据(1)国家法律、法规,地区颁布的安全、消防、环保、文物等管理规定(2)单管顶混凝土套管穿越公路典型图(3)现场踏勘情况,组织施工、技术和征地部门人员,现场踏勘,了解道路穿越位置的地理环境、地质条件以及路面车流情况。(4)施工技术标准及验收规范2、设计规范(标红部分可去掉)《油气长输管道工程施工及验收规范》GB50369-2006《油气输送管道穿越工程施工规范》GB50424-2007《钢质管道焊接及验收》SY/T4103-2006《石油天然气金属管道焊接工艺评定》SY/T0452-2002《油气管道线路标识通用图集》(CDP-M-OGP-PL-008-2010-1)《顶进施工法用钢筋混凝土排水管》JC/T640-2010《成品油输送管道用钢管通用技术条件》(Q/SYGJX103-2010)《油气输送管道感应加热弯管通用技术条件》Q/...