下载后可任意编辑关于提请 HT-JV 提供施工图纸的函件HT-JV根据 2011 年 1 月 14 日我们收到的“工程开工日期通知”(文函号 HT-30CL-SLLS-CW2-A0011),通知实施本项目的开工日期为2024 年 5 月 20 日。现在距离开工日期已不到一周了。According to January 14, 2024 we receive of the“ project start date notice ” (Letter HT-30CL-SLLS-CW2-A0011), The notice of implementation date for project is on May 20, 2024. less than a week before a start date that will be beginning工程即将开工了,请 HT-JV 尽快提供施工图纸,因为我们根据施工图纸才能做如下准备:The project will start later on.Please HT-JV supply construction drawings as quickly as possible. Because we according to construction drawings that we can make preparation as follows .1. 提交实施性的技术措施和生产加工车间图。To provide for actionability of technical measuresAnd Manufacturing shop drawing2. 采购符合规格要求的施工材料,材料采购还需要一定的采购周期。To purchase materials that meet the requirement prescribed .and the procurement of materials still needs a procurement period3. 加工材料,如锚杆、钢拱架等需要一定的周期。Work material, such as anchor rod .steel rib etc need a certain cycle4. 混凝土施工用的钢模台车加工、异型模板加工,闸门及其埋件等金属结构制作和运输需要一定的周期。Steel form carrier processing , special-shaped steel formwork processing for concrete placing and strobe ,embedded part metal construction needs some cycle for manufactured and transportation;假如因为图纸下发不及时造成了工期延误等问题,我们要求工期顺延并不承担相应的责任。We require that project postpone and do not assume any responsibility,. if it were the drawing not down 下载后可任意编辑in time, that causing a delayed schedule etc .Your quickly response and action shall be highly appreciated.Thank you.Yours faithfully.0 万 U 豆体验卡卡号:50D890668267e3349e33密码:686d03401eefba96faba奖品名称:500 万 U 豆体验卡卡号:50De7a00c543af387fc0密码:b26488ce65abc1787202奖品名称:500 万 U 豆体验卡卡号:50Dbac63885c802fd52e密码:3d1c344384327b85efff奖品名称:500 万 U 豆体验卡卡号:50Dd97f0765bdf6998a3密码:48db1c14e42a2b321fac奖品名称:500 万 U 豆体 50D61215eb41ae3cc919密码:25bffae5346e7b7d2548奖品名称:100 万 U 豆体验卡卡号:10D1cab621456ab278ab密码:709f65f32865af2559c2奖品名称:100 万 U 豆体验卡卡号:10D8f1d6a4b953f3474e密码:6e2e4017cce30dc7e055奖品名称:100 万 U 豆体验卡卡号:10Dd1fc6d6dd529b6892密码:a5dbdd8338f91d2c0701下载后可任意编辑奖品名称:100 万 U 豆体验卡卡号:10D08377b71d4374262b密码:1d7a7c21ebd99b798a54