电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

个旧锡矿老厂矿田接触带矿床勘查工程布置合理性探讨VIP免费

个旧锡矿老厂矿田接触带矿床勘查工程布置合理性探讨_第1页
1/5
个旧锡矿老厂矿田接触带矿床勘查工程布置合理性探讨_第2页
2/5
个旧锡矿老厂矿田接触带矿床勘查工程布置合理性探讨_第3页
3/5
下载后可任意编辑个旧锡矿老厂矿田接触带矿床勘查工程布置合理性探讨个旧锡矿老厂矿田接触带矿床勘查工程布置合理性探讨 李彬 摘要:老厂矿田位于个旧东区中部,随着生产勘探向外围深部拓展,亟需开展勘查工程布置合理性讨论,有效控制勘探风险,为矿山下一步找矿提供技术支撑。通过对已知矿体勘查工程间距和网度讨论,再对不同中段和不同网度下矿体资料的对比分析,综合得出矿山下一步工作中的参考网度:深度大于300m,預查网度 200×100m,深度 200~300m,普查网度 120×80m,深度 100~200m,详查网度 50×50m,深度 0~100m,勘探网度 25×50m。 关键词:勘查工程布置;勘查网度合理性;接触带矿床;老厂矿田;个旧锡矿 Abstract: The old factory mine is located in the middle of the Gejiu East District. With the expansion of production and exploration to the outer periphery , it is urgent to carry out research on the rationality of the layout of the exploration project to effectively control the exploration risk and provide technical support for the mine"s next prospecting. Through the study of the interval and network degree of the known ore body exploration project, and then the comparative analysis of the ore body data in different middle sections and different network degrees is conducted , and the reference network degree in the next work of the mine is comprehensively obtained: the depth is greater than 300m , the pre-inspection network degree is 200×100m, depth is 200~300m, survey network degree is 120×80m, depth is 100~200m, the detailed investigation network degree is 50×50m, depth is 0~100m, and the exploration network degree is 25×50m. 1下载后可任意编辑 Key words: survey engineering layout;rationality of survey network degree;contact zone deposit;old factory orefield;Gejiu tin mine 0 引言 随着老厂矿田井下无轨设备的推广应用,矿山开拓方式,系统建设,采矿方法等方面发生了变化。为了推动公司的快速进展,对矿产资...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

个旧锡矿老厂矿田接触带矿床勘查工程布置合理性探讨

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部