电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

碾压混凝土大坝渗漏分析与处理

碾压混凝土大坝渗漏分析与处理_第1页
1/8
碾压混凝土大坝渗漏分析与处理_第2页
2/8
碾压混凝土大坝渗漏分析与处理_第3页
3/8
下载后可任意编辑碾压混凝土大坝渗漏分析与处理碾压混凝土大坝渗漏分析与处理 摘要:本课题透过碾压混凝土大坝漏渗表面现象,通过分析碾压混凝土坝体施工工艺控制中存在的问题和坝体结构特点,找到坝体产生渗漏的源头,并结合坝体接(触)缝、碾压混凝土与防渗层之间的渗水特点,有的放矢的提出了采纳水泥灌浆为主的堵漏方式,解决了碾压混凝土坝体渗漏的难题,并节约了工程成本,为碾压混凝土大坝渗漏处理提出了可供借鉴的方案。 Abstract: In this topic, through the leakage surface phenomenon of roller compacted concrete dam, by analyzing the problems existing in the construction process control of the roller compacted concrete dam body and the structure characteristics of the dam body, the source of the dam body leakage is found , and a plugging method based on cement grouting is proposed by combining the seepage characteristics between the dam body contact seam , roller compacted concrete and anti-seepage layer , which solves the problem of roller compacted concrete dam leakage and saves engineering costs. This paper proposes a plan for the leakage treatment of roller compacted concrete dam. 关键词:碾压;混凝土;漏水;接(触)缝;结合缝;灌浆;封堵;根治 Key words: roller compaction;concrete;water leakage;contact seam;joint joint;grouting;plugging;radical cure 中 图 分 类 号 : TV543 文 献 标 识 码 : A 文章编号:1006-4311(20XX)15-0127-03 0 引言 碾压混凝土大坝漏水主要表现为坝后表面混凝土渗水、阴湿,其渗漏通道主要是碾压混凝土层间缝,作为碾压混凝土自身仍具有与常态混凝土同等防渗1下载后可任意编辑功能。因此,一旦碾压混凝土发生渗漏水现象时,对碾压混凝土大坝的渗漏处理集中表现层间缝的处理上;有些工程在进行渗漏处理时,参照基础防渗帷幕实行在坝顶布置 1-2 排帷幕灌浆孔,实行小排距、大间距布孔原则,孔间距一般2m 左右,排间距 0.4-1.0m,并参照帷幕灌浆施工技术要求实行自上而下分段进行灌浆,局部实行全孔一次成孔、自下而上分段灌浆直至孔口。为保证碾压混凝土“坝体帷幕”灌浆施工效...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

碾压混凝土大坝渗漏分析与处理

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部