下载后可任意编辑围护桩破桩头施工方案1目 录1 编制依据..............................................22 工程概况..............................................22.1 工程场地概况.....................................22.2 围护桩分布状况...................................22.3 参建单位........................................23 施工准备..............................................33.1 破桩头定义.......................................33.2 破桩头的目的.....................................33.3 施工条件.........................................33.4 机具准备.........................................33.5 人员安排.........................................44 施工工艺..............................................44.1 工艺流程.........................................44.2 施工顺序.........................................44.3 施工注意细节.....................................54.4 破除桩头小技巧...................................55 质量控制..............................................65.2 成品保护.........................................66 桩头质量缺陷及处理办法................................66.1 常见桩头缺陷.....................................66.2 缺陷处理措施.....................................67 工期控制..............................................78 安全文明施工..........................................81 编制依据( 1) 由**************公司提供的《***********》基坑围护设计施工图纸; ( 2) 由*****公司提供的《*******岩土工程勘察报告( 勘察编号: 11020-1) 》; ( 3) 相关的各种法律规范规程、 法律法规、 图集; 下载后可任意编辑2 工程概况2.12.1 工程场地概况工程场地概况*********拟建场地位于**西城路和规三路交会处西南角, ***东街北侧。场地原地势较低洼, 后堆土填积, 原有沟塘已填埋整平。场地现为空地, 地形略有起伏, 地面高程在 5.71~9.60m( 吴淞高程系) 之间, 场地地貌单元属长江漫滩。2.22.2 围护桩分布状况围护桩分布状况本工程基坑总面积约 39500m2, 总延长米约 780m, 自然地坪相对标高暂定为-0.400( ±0.000=+7.400) , 坑底标高-10.250m, 基坑挖深为 9.850m。基...