活动脚手架搭设方案 Plan of Erection Procedures for Movable Scaffold 2 / 6 目录TABLE OF CONTENTS 1. Prepare explanation 编制说明 .......................................................................... 3 2.Reference 编制依据 ........................................................................................... 3 3.Descprition of gantry 搭设方案 .......................................................................... 3 3 / 6 1. PREPARE EXPLANATION 编制说明 在*********中设备、管道及电气仪表安装过程中,为了安全施工及方便施工,在施工区域内搭设移动式脚手架。 We need build movable scaffoldings for safety installed the equipment、piping、electrical and instrument in **********, 2.REFERENCE 编制依据 ➢ 现行国家施工规范、标准及规程(但不限于) National construction criterion, standard and regulations(not limited) ➢ 《建筑施工高处作业安全技术规范》(JGJ80-91) Safety Technical Specification on Working in High Place of Building Construction JGJ80-91 ➢ 《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-2001 《Technical Code on the Safety of Scaffold of Steel Pipes in Fastener Connection for Building Construction》 JGJ130-2001 3、搭设方案 PLAN OF ERECTION 3.1 前提条件 Prerequisites ➢ 移动式脚手架由扣件式脚手架搭设。 The movable scaffold must be built in fastener connection. ➢ 移动式脚手架的各部件在使用前须经过项目部和**的***人员检查合格。 All parts must be checked by **** and the safety supervisors of***** as ok before being put to use. ➢ 移动式脚手架不得人力搬运,必须配有脚轮;所有脚轮都须配有自锁装置,使移动脚手架在使用时保持不动。 The movable scaffold must be handled with castors. No manual efforts are allowed in this regard; all castors are equipped with self-locking device, which serves to hold the movable scaffold still when it is use. ➢ 移动式脚手架的作业平台必须满铺脚手板,临边必须搭设踢...