钻 井 英 语 常 用 语 1
Mix 800 BBLS spud mud 配800 桶开钻泥浆 2
Hold a spud safety meeting w/crew prior to DRLG 22"Hole 钻22"井眼之前,开个安全会 3
How many bits are there on the rig-floor
钻台上有多少个钻头 4
There are two bits on the rig-floor, one is tri-cone bit, the other is a PDC bit
有两个钻头,一个是三牙轮,一个是PDC 钻头 5
Sweep hole w/100 BBL HVP while you drilled to casing setting point 钻达下套管深度时用100 桶高粘清扫井眼 6
Take a Totco survey if any bit trip ,take a wireline survey if lost circulation occurs otherwise , Drop ToTco
一旦起钻投测,若井漏,吊测,否测投测
Spot 250 BBLS HVP on Bottom
Drop Totco, slug pipe ,pull out of hole (POOH)
封底 250 桶高垢投测,重浆压钻杆起钻 8
Run casing into hole
Pooh for 185/8"CSG & lay down 22"BHA
起钻下18-5/8” 套管,甩掉 22” 钻具组合
Circulation bottoms –up 循环一周 11
Mix/pump 400 sacks דG” cement , Dropped plug