目 录1.工程概况························3 工程概况·························31.2 编制依据························3冲孔桩的施工说明······················4要点····························72.施工平面布置及施工用电、用水方案············82.1 施工总平面布置·····················8······························82.3 施工用水、用电方案···················83.工程管理机构及劳动力组织················83.1 工程管理机构······················83.2 劳动力配置方案·····················9······························104. 施工进度方案及工期保证措施 ···············104.1 施工进度方案······················104.2 工期保证措施······················115. 施工方案及施工方法···················125.1 施工准备························125.2 施工方法························145.3 常见事故及处理措施···················215.4 泥浆处理及渣土外运···················26······························26······························286. 质量保证体系及保证措施·················29······························296.2 质量保证措施······················317. 平安生产、文明施工保证措施···············327.1 平安生产保证体系及保证措施···············327.2 文明施工与环境保护措施·················351. 工程概况工程概况占地 119658m2,m2,。首层布置商场、西式快餐、派出所和街道办等;二层布置超市、派出所和街道办等;三层主要布置超市;四层主要布置康体活开工程以及配套效劳;地下室为汽车库及附属...