桂阳县 Y672 线高沙桥 2-2#18m 预应力混凝土空心板静载试验报告2024 年 12 月 17 日注 意 事 项(Notices)1、报告无检测报告专用章无效。(Test report is invalid without stamp of inspection report on it.)2、复制报告未重新加盖检测报告专用章无效。(Duplication of test report is invalid without stamp of inspection report re-stamped on it.)3、报告无负责人、审核人、批准人签名无效。(Test report is invalid without the signatures of the persons for project management, verification and Approval.) 4、报告涂改无效。(Test report is invalid if altered.)5、对检测报告若有异议,应在报告发出后 15 个工作日内提出。(Different opinions about the test report should be reported to the test department within 15 days from the date of receiving the test report.)6、本报告对项目提出的任何处理或加固等建议均不能为施工文件,其实施必须以有效设计文件为依据。 (Any proposed handling or reinforcing suggestions for the project in this report can not be used as formal construction documents. The construction should be performed on basis of licensed design documents.)桂阳县 Y672 线高沙桥 2-2#18m 预应力混凝土空心板静载试验报告工程名称:桂阳县高沙桥 2-2#空心板建设单位郴州市桂阳县农村公路管理站设计单位:郴州市路通设计有限公司监理单位:深圳市华祥路桥建设工程咨询有限公司施工单位:广东省梅州市市政建设集团公司检测单位:湖南湖大土木建筑工程检测有限公司委托单位:郴州市桂阳县农村公路管理站项目负责人:现场检测人:报告撰写人:报告审核人:报告批准人:2024 年 12 月 17 日目 录第一章 概述..............................................................................................3工程概况..................................................................................................................................3试验目的..................................................................................................................................3试验依据.................................................