1 编制说明..........................................................11.1 编制依据....................................................11.2 编制审核人员................................................11.3 本施工方案发放范围..........................................12 工程概况..........................................................13 施工部署与设计....................................................23.1 施工电梯定位................................................23.2 基础加固....................................................33.3 人货电梯接料平台搭设........................................44 脚手架的搭设......................................................94.1 立杆........................................................94.2 大横杆.....................................................104.3 小横杆.....................................................104.4 脚手板.....................................................104.5 连墙件.....................................................104.6 防护.......................................................115 脚手架搭设的注意事项.............................................116 拆除施工工艺.....................................................127 脚手架使用注意事项...............................................128 计算书...........................................................131 编制说明1.1 编制依据 1.1.1 设计图纸 1.1.2 SCD200/200TD 型升降机使用说明书 1.1.3 本项目施工组织设计 1.1.4 中建五局现场施工红线管理规定 1.1.5 中建五局《施工现场安全质量标准化图集》(WJBZ-CS0001-2025) 1.1.6 本施工方案涉及的有关的国家(地方)或行业法律规范、规程、法规、标准、图集,主要是《建筑施工扣件式钢管脚手架安全技术法律规范》(JGJ 130-2025)、《建筑施工安全检查标准》(JGJ59-2025)、《危险性较大的分部分项工程安全管理办法》(建质[2025]87 号)、《建筑结构荷载法律规范》(GB50009-2025)、《钢结构设计法律规范》(GB50017-2025)、《混凝土结构设计法律规范》(GB50010-2025)等。1.2 编制审核人员编制人员:段 辉审核人员:冯建周 ...