目录一、编制依据...................................................1二、工程概述...................................................22.1 工程简介................................................22.2 气象条件................................................5三、施工工艺...................................................63.1 施工工艺流程............................................63.2 技术准备................................................73.3 伸缩缝施工..............................................7四、施工计划..................................................104.1 人员计划...............................................104.2、设备计划..............................................114.3、材料计划..............................................114.4、进度计划..............................................12五、质量保证措施..............................................125.1、组织保证措施..........................................125.2、技术措施..............................................13六、安全生产保证措施..........................................146.1、安全管理原则..........................................156.2、安全生产技术措施......................................156.3、施工用电安全保证措施..................................17七、文明施工、环境保护措施....................................17八、进度保证措施..............................................17一、编制依据(1)《广州市南沙区凤凰一、二、三桥工程两阶段施工图设计》;(2)《公路桥涵施工技术法律规范》JTG/T F50-2025(3)《公路工程质量检验评定标准》JTG F80/1-2025(4)《公路桥梁伸缩缝装置》JT/T327-2025(5)《公路工程施工安全技术规程》JTJ F90-2025(6)《公路桥梁钢结构防腐涂装技术法律规范》JT/T 722-2025(7)《钢结构设计法律规范》GB 50017-2025(8)《钢结构工程施工质量验收法律规范》GB 50205-2001二、工程概述2.1 工程简介广州市南沙区凤凰一、二、三桥工程第二合同段(K2+189~K4+334)主线全长 2.145km,辅道(K2+765~K4+445)全长 1.68km。包括一座跨江大桥(凤凰二桥,40+4×58+40m 上承式砼葵花型拱桥)跨越上横沥水道,高架引桥长1833m...