常州市金坛区丘荡路西侧、新镇广路东侧河道工程施工组织设计2025、6、30目 录一、 编制阐明 ··············································01二、 编制根据及原则 ········································012.1编制根据···········································012.2编制原则···········································01三、工程管理目旳···········································02四、工程概况···············································024.1工程地理位置及地质情况····························024.2工程范围及规模····································034.3工程主要特点······································03五、设备、人员动员周期及材料组织供给·······················045.1人员、设备动员周期·································045.2技术准备···········································045.3材料组织供给·······································05六、施工准备及临时设施····································056.1临时房屋设施·······································056.2水、电设施·········································06七、 施工组织机构建旳立 ····································067.1 组织机构设置······································067.2施工组织管理机构运旳作·····························07八、施工计划·····································...