目录一、编制依据...............................................................3二、工程概况与施工重难点.....................................................32.1、工程概况...........................................................32.2、施工难点及注意事项.................................................4三、工程目标.................................................................53.1工期目标............................................................53.2质量目标............................................................53.3安全目标............................................................53.4环保及文明施工......................................................5四、施工安排.................................................................5五、施工方法.................................................................85.1、施工顺序...........................................................85.2、测量定位...........................................................95.3、沟槽开挖...........................................................95.4、特殊地质路段施工..................................................115.5、检查井施工........................................................145.6、管基施工..........................................................165.7、管道安装..........................................................165.8、闭水试验..........................................................175.9、沟槽回填..........................................................18六、质量体系及验收标准......................................................196.1质量保证体系组织机构...............................................196.2、工序质量保证措施..................................................196.3质量验收标准.......................................................206.4管道工程质量通病防治措施...........................................21七、安全、文明施工保证措施..................................................237.1、安全生产责任制....................................................237.2、安全教育..........................................................237.3、安全检查..........................................................247.4、危险源辨识........................................................247.5、安全生产保证体系组织机构..........................................257.6、安全施工保证措施..................................................25八、季节性施工保证措施......................................................268.1雨季施工...........................................................26九、管道吊装计算............................................................28十、附图、附表..............................................................30XX路二工区排水工程施工方案一、编制依据1.1、XX路改扩建工程设计图纸及相关技术资料;1.2、施工总体部署及相关文明施工要求;1.3、XX路改扩建工程地质勘察报告;1.4、国家、行业及湖南省颁发的施工及验收规范、工程质量检验评定标准及相关法规等;1.5、公司《质量、环境和职业健康安全管理手册》和程序文件;1.6、本公司现有资源和其它可利用资源;1.7、本工程的现场条件、施工特点及类似工程的施工经验;1.8、本工程使用的国家标准、规范,详见附表;1.9、2010年7月2日深基坑(排水工程、综合管沟工程)施工方案专家论证会会议纪要。二、工程概况与施工重难点2.1、工程概况XX路二工区施工段位于太阳大道至姻缘河桥(桩号K4+540~K9+180)。雨水管道与污水管道平行布至于道路两侧非机动车道范围内,雨、污排...