雨季施工专项施工方案培训资料斯里兰卡阿塔纳水厂Gampaha,Attanagalla&Minuwangoda Integrated Water Supply Scheme雨季施工专项施工方案Method Statement in Rainy Season编制:Prepared By:审核:Reviewed By:批准:Approved By:CMEC 公司斯里兰卡阿塔纳水厂项目部 Gampaha,Attanagalla & Minuwangoda Integrated Water Supply Scheme 编制时间: 09 月 01 日Preparation Date:1st September , 目 录Contents第一节、第二节编制依据............................................01Chapter I Preparation Basis第二节、工程概况.....................................01Chapter II Project Overview第三节、 雨季施工原则................................04Chapter III Construction Principles in Rainy Season第四节、施工步骤.....................................05Chapter IV Construction Procedures第五节、雨季施工管理目标.............................10Chapter V Construction Management Targets in Rainy Season第六节、 雨季施工的主要部位............................11 Chapter VI Major Areas for Construction in Rainy Season第七节、雨季施工主要技术管理措施.....................11Chapter VII Main Technical Measures7.1 雨季施工管理..................................11 7.1 Construction Management in Rainy Season7.2 地基与基础工程...............................13 7.2 Foundation and Base Works7.3 地下防水工程.................................16 7.3 Underground Waterproof Engineering7.4 钢筋工程......................................17 7.4 Reinforcement Works7.5 模板工程......................................18 7.5 Formwork7.6 混凝土工程....................................19 7.6 Concrete Works7.7 机电安装工程..................................22 7.7 Mechanical and Electrical Installation Works7.8 砌筑工程......................................30 7.8 Masonry Works7.9 装饰装修工程.................................31 7.9 Decoration Engineering7.10 脚手架工程....................................33 7.10 Scaffolding Works7.11 物资及设...