目 录1 编制依据...........................................................................................................12 工程概况...........................................................................................................13 塔吊拆除前准备工作.........................................................................................24 拆除单位作业准备和条件要求...........................................................................35 拆除前的准备工作............................................................................................46 施工控制点及作业流程.....................................................................................47 塔吊拆除作业程序内容.....................................................................................48 作业质量技术标准............................................................................................69 安全措施...........................................................................................................610 环保要求.........................................................................................................711 附件(塔吊拆除负荷计算)...................................................................................712 应急救援预案..................................................................................................8 1 编制依据1 《TC7035 塔式起重机使用说明书》、塔机基础施工方案及项目提供的施工图纸;2 《建筑塔式起重机安装检验评定规程》(DBJ/T15-73-2025 广东省)3 《建筑机械使用安全技术规程》(JGJ33—2001);4 《特种设备安全监察条例》(国务院第 373 号令);5 《建筑起重机械安全监督管理规定》(建设部 166 号令);6 《塔式起重机安全规程》(GB5144—2025);7 《起重机安全规程》(GB6067.1—2025);8 《塔式起重机安装使用拆卸安全技术规程》(JGJ196-2025);9 《建筑施工高处作业安全技术法律规范》(JGJ80-1991);10 《建筑施工安全检查标准》JGJ 59—99;11 《危险性较大的分部分项工程安全管理办法》(建设部 87 号文);12 《重型设备吊装...