电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

T构转体施工工艺框图

T构转体施工工艺框图_第1页
1/1
T-structure turning construction technology Frame Reaching design requirementconcrete strength reachingover 85%than design valueconcrete strength reaching over 85%than design value Foundation 1st fioorconcreringWelding foundation steel,preservedpiersted of pierInstalling sub-table stedplate&stedaxle axleFoundation top concreting&supporting colunnSub-circle way sandMortar levelingSub-table sted plate paintingGrease fluorine powderUpper table insert fluorine mushroom end ,painting greaseHoisting upper table sted plate to proper placeErecting form & concreting upper table&temporary supportConcreting pierErecting form & concreting beam Section No.0.1.1’Tensioning beam Section No.0,1&1’Removing SupportsConcreting symmtrey beam section from2(2ˊ)to10(10ˊ),lapping supports to concrete from 12(12ˊ)to15(15ˊ)Removing temporary Support on turntableTurning bodySealing TableWelding connection section 11(11ˊ)skeletonTemporary strandtensionConnection sectionconcretingBottom Plate Vertical Prestress tensionConcreting & sealingRemoving Temporary strandConnectionSection tensionRemoving supports of Cast-in-place sectionErecting border spanT-beamBridge pavement

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

T构转体施工工艺框图

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部