六柱支撑式水塔爆破拆除六柱支撑式水塔爆破拆除 摘要:介绍了徐州铁矿机械厂六柱支撑式水塔爆破拆除,通过对现场环境和影响倒塌方向因素分析,采纳加固措施确保倒塌方向的准确性和后座。爆后水塔定向准确,没有对周围设施造成任何影响,取得了圆满成功。 关键词:加固;水塔;定向爆破 中图分类号: TV641.5 文献标识码:A 文章编号: Six Pillar Supporting Type Water Tower Blasting Demolition WEI Zhong-yi (1 China mine blasting technology co., LTD Xuzhou 221008, China) Abstract: Solid Introduced Xuzhou Iron Mine Machinery Factory six pillar supporting type water tower demolition blasting, through the analysis of the site environment and collapse direction influence factors,take the reinforcement measures to ensure the accuracy of the collapse direction.After the explosion, water tower is collapsed accurately in a direction, without any impact on the surrounding facilities, and gets a complete success. Key words: reinforce;water tower;directional blasting 1 水塔周围环境与结构 该水塔座落在徐州铁矿机械厂院内,废弃多年,由于年久失修支撑柱部分表皮混凝土脱落,主筋锈蚀,已严重威胁到安全生产。水塔高 29.50 米,直径 7.6 米,等边钢筋砼六柱支撑,柱截面尺寸为 0.3m×0.4m,底部两层被改建为厂内临时用房,环境复杂。距北侧厂房 7.9m,南侧库房水平距离 2.8m,距西南侧厂房仅 2.0m,西南13.4m 处为全厂使用的变压器站。 图 1 水塔周围环境 Fig.1 Environment of water tower 2 爆破方案选择 由于受水塔周围环境所限只能向西定向倒塌,但是存在以下问题:爆破时水塔只剩倒塌方向背面两个立柱作为支撑点,支撑力难以保证,易形成后座,而且倒塌方向难以控制;水塔倾倒撞击地面后会向两侧支出,再有在水塔南侧高 25.0m 处向外突出的平台距高压线和厂房水平距离只有 1.4m,稍有差池,势必会对南侧房屋及高压线造成不利影响。 综合以上所述必须对水塔实行加固措施,在支撑部位增加两个立柱,截面尺寸为 0.4m×0.6m,并将倒塌方向向北偏移 30 度,以确保倒塌方向的准确性和不对南侧厂房及高压线造成影响。 图 2 加固位置 Fig.3 Reinforce part 3 爆...