Craft Food BDA project and CFG pile combined foundation treatment projectxx 项目 CFG 桩复合地基处理工程Design Technology Documents设计技术文件Design 设计:Approved 审定:Manager 负责人:Design department:设计单位: Bidding department:.投标单位: Tables of Content目 录Chapter One: Introduction of the project一、工程概况Chapter Two: Contents of the project二、工程项目内容Chapter Three: Introduction of engineering geology三、工程地质情况介绍Chapter Four: Selecting scheme四、方案的选择Chapter five: Selecting the scheme of combined footing五、编制依据及设计原则Chapter Six: Selecting construction technics六、施工工艺选择Chapter seven: Designing and calculating combined footing of CFG pile七、CFG 桩复合地基设计及计算Chapter eight: Check computations of combined footing of CFG pile八、CFG 桩复合地基验算Chapter Nine: Designing parameter and conclusion九、设计参数及结论Chapter Ten: Construction drawing十、施工图Chapter Eleven : Design quality certificate十一、设计资质证书Geotechnical engineering design certificate(The First Grade)岩土工程设计证书(甲级)Building engineering design certificate(The First Grade)建筑工程设计证书(甲级)一、 Introduction of the project工程概况The Craft Food BAD Project locates at Beijing Economic and Technological Development Area. xx 项目工程地址位于 xx 经济技术开发区。The topography of the construction area is even and widen, the nature ground elevation is between 24.99 m and 25.55 m.施工区域地势平坦开阔,自然地面标高 24.99~25.55m。The construction company is Craft Food (China) Co.Ltd.本工程建设单位是:xx 有限公司。The company of the top design of building and civil engineering structures is The Eleventh Design & Research Institute of IT, Co., Ltd.本工程上部结构设计单位是:xx 有限公司。二、Connents of the project工程项目内容Because the natural bearing stratum is two...