电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

大体积混凝土“跳仓法”-与加强带施工工法

大体积混凝土“跳仓法”-与加强带施工工法_第1页
1/5
大体积混凝土“跳仓法”-与加强带施工工法_第2页
2/5
大体积混凝土“跳仓法”-与加强带施工工法_第3页
3/5
大体积混凝土“跳仓法” 与加强带施工工法大体积混凝土“跳仓法” 与加强带施工工法 摘要:大型超长结构中为控制混凝土温度造成的影响,根据《混凝土结构设计法律规范》GB20010-2025 要求,都必须要在结构底板、楼板及壁墙多处设置后浇带,待大体积混凝土收缩稳定后再浇筑后浇带混凝土,以此来防止由温度引起的收缩性非结构墙体、楼板裂缝。对于施工来说,后浇带增大了施工难度,延长了工程工期,且极易造成一些质量安全等隐患。 关键词:大体积;混凝土;施工工法 Abstract: Large super-long structure for controlling concrete temperature influence, according to the " code for design of concrete structures " GB20010-2025 requirements, must be in the floor, floor and wall with multiple settings after pouring belt, the shrinkage of the mass concrete stability after pouring concrete, in order to prevent the contraction caused by temperature non structural wall, floor cracks. For the construction, after pouring belt increases the difficulty of construction, extend the period of a project, and easy to cause some quality and safety problems. Key words: mass concrete; construction technology; 中图分类号:TV544+.91 文献标识码:A 文章编号: 1.前言 为克服后浇带施工带来的诸多问题,我们采纳了大体积混凝土“跳仓法”施工并将后浇带改为加强带的做法,并自 90 年代开始经过十几项大型、双层地下室、深基础地下工程的施工实践,获得了显著的成效和经验,特汇成此工法。该工法符合《大体积混凝土施工法律规范》(GB50496―2025)并有所创新与改进。 该工法于 2025 年通过了江苏省建筑工程管理局组织的专家鉴定认为该项技术所编制的大体积混凝土“跳仓法”施工工法对在更大的范围应用中提供了实例范本,其水平达到了国内先进水平。 2.特点 2.1 加强带与结构混凝土同时施工,大大缩短了结构施工工期。 2.2 加强带消除了后浇带所容易造成的混凝土接缝不严密、错台、接搓明显的质量通病,利于保证地下室工程质量。 2.3 加强带克服了后浇带容易积水,积集建筑垃圾增加施工难度的弊病,减轻工人劳动强度,利于降低工程成本。 2.4 加强带有利于避开混凝土因温度引起的收缩性非结构...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

大体积混凝土“跳仓法”-与加强带施工工法

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部