简述水利建设工程造价有效控制简述水利建设工程造价有效控制 摘要:水利工程建设工程的造价控制与整个工程建设是紧密联系的,造价的控制包含投资决策、勘探设计、施工等阶段,每个阶段都会对造价产生不同的影响。把工程造价控制在合理范围内的关键就要先从投资决策和设计这两个阶段抓起,作出投资决策后,设计是控制工程造价的关键。本文针对投资决策、设计、施工阶段等方面探讨在整个建设过程中如何有效控制工程造价。 关键词:水利工程;工程造价;控制;管理 Abstract: The construction of water conservancy project cost control and the project construction is closely linked, cost control includes investment decision-making, design, construction, exploration stage, each stage will have different effects on the cost. The key of project cost control in the reasonable scope will start from the two stages of the investment decision-making and design stage, make the investment decision, design is the key of engineering cost control. According to the investment decision, design, construction and other aspects of how to effectively control the project cost in the entire construction process. Key words: water conservancy project; project cost; control; management 中图分类号:TV 文献标识码:A 文章编号: 1.投资决策阶段造价控制管理 投资决策阶段是项目建设过程中最开始更是最重要的一个阶段,一个建设项目一开始就需要对其经济及技术这两个方面进行考察和评价,并拟出最优秀的方案,以便今后对工程进行投资策划,它是控制工程建设投资的重要依据。在这一阶段,需要选择合适的地点和先进的工艺设备,以及确定现阶段的科技标准,工程项目的投资估算要严格的审查,务必要做到公正,公平,合理。做好项目的决策的第一步是收集基础资料和对资料的整理,例如工程选址、工程地的基础设施情况、所需材料的用量和机械设备等的价格定额以及当前的市场价格、大批量材料的采购地和现有的已建或在建中类似工程的资料等,这些数据都给今后的工程建设和经济分析提供了重要的依据。此外,还需要对市场调查进行认真调查,市场调查必须要公正,务必一切从实际出发,态度要认真认真。公正...