高压摆喷灌浆防渗墙施工技术的应用

高压摆喷灌浆防渗墙施工技术的应用_第1页
1/5
高压摆喷灌浆防渗墙施工技术的应用_第2页
2/5
高压摆喷灌浆防渗墙施工技术的应用_第3页
3/5
高压摆喷灌浆防渗墙施工技术的应用高压摆喷灌浆防渗墙施工技术的应用 摘要:松花江大顶子山航电枢纽工程采纳高压摆喷灌浆技术,成功解决了防渗墙方案防渗问题。本文主要介绍了施工参数、钻孔、孔距、浆液材料、灌浆施工及其质量控制和检验方法。高压摆喷灌浆技术具有效果好、速度快、质量好、经济适宜等特点,与其它工法相比,具有明显的技术经济优势。 关键词:施工参数;钻孔;浆液材料;高压摆喷灌浆;防渗墙 Abstract: the songhua river big DingZi ShanHang electric key project using high pressure pendulum jet grouting technology, successfully resolved the impervious wall seepage scheme. This paper mainly introduces the construction parameters, drilling, hole spacing, grout materials, grouting construction and quality control and inspection method. High pressure pendulum jet grouting technology has good effect, high speed, good quality, economic appropriate etc., and other methods, compared with obvious technical and economic advantages. Keywords: construction parameters; Boring; Serous materials; High pressure pendulum jet grouting; cut-off 中图分类号:TU74 文献标识码:A 文章编号:2095-2104(2025) 1.概述 松花江大顶子山航电枢纽是一座以航运、发电和改善哈尔滨市水环境为主,同时具有交通、水产养殖和旅游等综合利用功能的低水头航电枢纽工程。枢纽建筑物有船闸、泄洪闸及混凝土过渡坝段、河床式水电站、土坝、闸(坝)上公路(桥)等。水库正常蓄水位116.00m,总库容 19.97×108m3,装机容量 66MW,最大下泄流量22704m3/s。 2.高压摆喷设计 大顶子山航电枢纽工程土建 A 标右岸一期围堰坝基为松散的级配不良的细、中、粗砂,厚度约 10.00m,坝基防渗采纳混凝土防渗墙,墙厚 0.40m,防渗墙底高程深化泥岩强风化带下限 1.0m,上部深化粘土 2.0m。防渗墙布置于围堰轴线上,围堰轴线全长1967.99m,上游堰顶高程 119.46m,墙体深度 17.46m,下游堰顶高程 116.96m,墙体深度 14.96m,均深化岩石 0.5m。其工程量:围堰轴线长度 1967.99m,高喷灌浆 285710.00m,钻孔进尺 285710.00m。摆喷防渗墙施工平台高程 119.46~116.96m。 3.高压摆喷灌浆防渗墙 高压摆喷灌浆技...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

高压摆喷灌浆防渗墙施工技术的应用

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部