Safe Signs and Barriers安全标识和围护ISSUEREVISSUE OR REVISIONDESCRIPTIONORIGINBYDATECHK’DBYDATEAPP’DBYDATER00ORIGINALCONTENTS 目录1INTRODUCTION 介绍 2AIM目的3RESPONSIBILITIES 职责 4PROCEDURE 程序5DISAPPLICATION 不适用范围1.INTRODUCTION 介绍During the course of construction phase, certain hazards are inevitable。 For example high noise, use of radiation source, potential drop objects etc. Whenever there is a risk, which cannot be avoided or controlled by other means, BBTSS requires adequate warning signs or barrier tape to be used to warn personnel entering the project site about the hazards. These warnings signs include warning on PPE requirement, hazard identification, emergency escape route etc. The signs must contain a pictogram to convey the message, instead of relying solely on text. 在施工过程中,一定程度的危险是不可避开的。例如噪音、放射源的使用、可能坠落的物体等.对于存在危险的地方,假如无法使用其他方法避开和进行控制,则 BTSS 要求使用足够的警告标识或围绳警告进入此类危险物质项目场地的人员。这些警告标识应包括人身防护设备的要求、危险警告、紧急逃生路线等。除文字外,这些警告标识应包含图形来传达警告信息。2.AIM 目的The aim of this procedure is to ensure management and staff and all employees receive suitable and adequate information, instruction and training in the meaning of safety signs and the measures to be taken in connection with them。此程序的目的在于确保所有管理和工作人员得到适当关于安全标识含义的说明,要求和培训,以及应实行的与之相关的安全措施。3.RESPONSIBILITIES BTES project manager is responsible for implementing the procedure.BTES Construction manager is the person who ensure all risk on construction site is identified and properly signed or barricaded by warning code. All resources and personel needed for the related work are arranged。HSE manager maintaini...