1.编制依据..........................................................11.1施工合同及招投标文件........................................11.2工程地质勘察报告............................................11.3经过有关部门审批的有效施工图................................11.4工程所涉及的主要规范、标准如下:.............................12.工程概况..........................................................12.1工程建设概况.................................................12.2工程设计概况.................................................22.3自然条件.....................................................32.4项目工程重点与难点...........................................33.施工部署..........................................................43.1施工部署原则:...............................................43.2工程工期目标.................................................44.施工准备工作......................................................44.1施工进场准备................................................44.2物质准备.....................................................55、施工方案.........................................................65.1施工流向和施工顺序...........................................65.2测量定位.....................................................75.3基础工程.....................................................95.4主体工程....................................................105.5屋面工程....................................................175.6装饰工程....................................................195.7主要施工大型机械选择........................................206、主要施工管理措施................................................206.1文明施工要求................................................206.3工期保证措施...............................................216.4季节性施工措施..............................................226.5保证质量措施................................................257、施工平面布置....................................................287.1施工总平面平布置依据........................................287.2施工总平面平布置原则........................................287.3现场道路及排水..............................................287.4现场机械、设备的布置........................................287.5现场材料加工、堆放场地......................................297.6现场机械、设备的布置.......................................297.7现场办公区、生活区.........................................297.8临时用水布置...............................................298、进度计划........................................................308.1工程量计算..................................................308.2分析工作间的逻辑关系........................................308.3施工进度表..................................................308.4检查、优化进度计划..........................................308.5网络计划图..................................................30附表一:工程量、动量一览表..................................31附表二:各施工过程流水节拍计算表............................321.编制依据1.1施工合同及招投标文件1.2工程地质勘察报告福建省××地质工程勘察院提供的希望之星小学教学楼工程地质勘探报告1.3经过有关部门审批的有效施工图1.4工程所涉及的主要规范、标准如下:(1)《工程测量规范》(GB50026-2007)(2)国家政策、法规以及相关的技术规范,标准等(3)《建筑施工组织设计规范》GB+T50502-2009(4)省、市主管部门有关建...