第0页共109页和玉.世纪新城(二期)基础施工专项施工方案和玉.世纪新城(二期)项目基础施工专项方案编制单位:八冶建设集团有限公司编制人:审核:编制时间:2017年7月5日目录第一节工程概况·······················61.1参建单位简介:······················6第1页共109页和玉.世纪新城(二期)基础施工专项施工方案1.2工程概况:························61.3、地形地貌························61.4、地层岩性························61.5、地质构造························61.6水文地质条件·······················61.7、不良地质现象及地质灾害················61.8、岩体基本质量等级····················6第二节编制依据及原则····················62.1、编制依据·······················102.2、编制原则·······················122.3、编制范围·······················13第三节施工计划:·····················133.1、施工进度计划(附后)·················133.2、材料计划·······················133.3、设备计划·······················14第四节主要施工工艺技术:技术参数、工艺流程、施工方法、检查验收等····························164.1、施工前的准备工作···················164.2、主要施工技术参数···················17第2页共109页和玉.世纪新城(二期)基础施工专项施工方案4.2.1人工挖孔桩参数····················174.2.1条形基础施工参数················174.2.3独立基础施工参数···················204.2.4地梁及地抬梁参数···················214.3、主要施工工艺·····················224.3.1人工挖孔桩施工工艺··················224.3.1.1、施工流程·····················22基础分项工程及质量验收检验批划分··············224.3.1.4、开挖方法及运渣··················314.3.1.5、钢筋笼制安····················324.3.1.6基坑、挖孔桩孔质量检测···············324.3.1.7混凝土浇筑·····················344.3.1.8、施工保证措施···················354.3.2独立柱基施工工艺···················444.3.3条形基础及基础梁施工·················47第五节安全管理体系及施工安全保证措施···········485.1、安全管理目标·····················485.2、安全组织机构及安全领导小组··············485.3、安全保证制度·····················495.4、危险源辨识······················505.4.1、人工挖孔桩施工的安全难点······错误!未定义书签。第3页共109页和玉.世纪新城(二期)基础施工专项施工方案5.4.2、人工挖孔桩施工的主要危险源识别···错误!未定义书签。5.5、人工挖孔桩安全防控措施················525.6人工挖孔桩事故发生现场急救措施·············545.7、监测监控·······················635.7.1、观测目的、依据及监测内容··············635.7.2、基准点、监测点的布设与保护·············645.7.3、监测方法······················645.7.4、监测频率··...