庆华·长安家园地下车库安装施工组织设计编制单位:中天西北投资建设集团有限公司第1页共28页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共28页编制日期:2017年6月15日编制人:审核人:审批人:庆华·长安家园地下车库施工组织设计目录第一章工程简介一、编制依据································2二、工程概况································2三、工程特点································3-6第二章质量计划、质量通病防治措施一、质量管理目标、通病防治措施·······················6-8二、工程质量检验与验收···························8第三章施工组织及施工部署一、施工组织及准备·····························8-9二、施工部署原则······························9三、施工前准备·······························9-10四、施工配合································10-12第四章施工进度计划第五章施工程序及施工要点一、总体要求································12二、施工程序及施工要求(一)电气工程安装······························12-18(二)给排水及消防水系统工程安装·······················18-20(三)采暖系统安装······························20-22(四)通风空调工程安装····························22-24(五)节能工程································24第六章工程技术、质量、安全措施一、工程技术管理·······························24二、施工管理·································24-25三、技术措施·································25-26四、质量保证措施·······························26-27五、质量管理点的管理措施···························27六、安全技术措施·······························27-29七、消防保卫措施·······························29八、夏、雨季施工措施·····························29-30九、现场文明施工措施·····························30十、工程技术资料的管理····························30十一、竣工图编制、审核与移交·························30-31十二、竣工验收·······························31第七章成品保护第2页共28页第1页共28页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共28页一、设备及安装成品保护····························31第八章人工器具及二次深化设计附表一、工程计划投入人数计划表··························31二、主要施工机具需用计划表··························32三、车库管道、桥架深化排列布置图·······················33-36第一章工程简介一、编制依据:本施工组织设计编制依据庆华·长安家园地下车库工程施工图纸、图纸会审纪要等有关资料;国家颁发的有关施工规范和设计标准;地方政府所颁发的施工规范和标准;我公司质量体系各文件《质量手册》、《管理文件》、《技术标准》等相关内容;我公司承建类似工程施工经验资料等编制而成...