泸州化工园区原料结构调整项目建筑、安装工程项目管道工厂化预制方案重庆工业设备安装集团有限公司2014年6月目录1、工程概况··········································12、主要实物工程量····································23、项目组织结构······································24、流程管理··········································35、材料管理方案······································56、焊接方案··········································87、成品管理制度······································178、安全管理方案······································189、附录一:预制生产线工艺评定························2510、附录二:生产线常用操作参数·······················3111、附表三:管道预制的工作界面界定···················3212、附录四:常用焊接材料选用表·······················3313、附表:生产线使用过程中所需填写的表格·············341一、工程概况概述:泸州化工园区原料结构调整项目建筑、安装工程包含贮煤筒仓土建及安装;输煤栈桥、转运站及破碎楼等土建及安装工程;备煤系统变电所土建和安装;气化、渣水装置机电仪安装;变换、脱硫脱碳装置管道机电仪安装;二氧化碳压缩、氨冰机管道机电仪安装;硫回收土建和安装;空分装置管道机电仪;脱盐水除氧安装;净化变电所土建和安装;空