第1页共38页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共38页简介该工程为室内篮球馆,檐口标高为,建筑面积为,结构使用年限年,抗震设防重要性为丙类,设防烈度为度,设计基本地震加速度,设计地震分组为第二组,场地类别为Ⅱ类,地面粗糙度类,结构安全等级二级,耐火等级为二级,地基基础设计等级丙级,砌体施工质量控制等级为级。主钢构梁柱钢材选用钢,屋面板采用厚型夹心板,外板为蓝色,内板为白色。标高以下为砖墙,标高以上墙体采用双层型单板夹厚保温棉,内板,外板,内外板均为白色。钢结构篮球馆施工方案目录施工组织设计编制说明与工程概况···········································施工组织设计编制原则和依据···········································工程概况·························································工期目标·······················································工程质量目标··················································安全目标·····················································文明施工目标··················································工程进度计划及材料供应········································主要用材······································第2页共38页第1页共38页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共38页···············工程进度计划安排·····················································材料供应计划·····················································施工组织管理···························································项目管理组织机构和主要施工管理人员配置·······························施工管理准备工作·····················································施工队伍进场筹备工作·················································劳动力配置·················································机械设备配置·················································主要施工方法·······················································土建施工·················································构件的预制和运输·················································钢结构安装·················································油漆、防火涂料的施工·················································彩钢板安装······································第3页共38页第2页共38页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共38页···········其他工程...