G104滁州至汊河改建工程(二期)监理计划G104滁州至汊河改建工程监理计划编写:审批:批准:G104滁州至汊河改建工程(二期)总监办二零一三年十一月1G104滁州至汊河改建工程(二期)监理计划目录1.工程项目概况···························································32.监理工作范围···························································33.监理工作内容···························································44.监理工作目标···························································55.监理工作依据···························································56.项目监理机构组织形式···············································67.项目监理机构人员配备计划及进退场计划·······················78.项目监理机构人员职责···············································79.监理工作程序··························································1310.监理方案·······························································1311.监理工作制度·························································1612.监理设施································································18安徽虹桥交通建设监理有限公司2G104滁州至汊河改建工程(二期)监理计划G104滁州至汊河改建工程(二期)监理计划根据建设单位与监理单位签订的监理合同,按照《公路工程监理规范》(JTG10-2006)和国家的有关政策法规与规程,为规范本工程监理目标实施,特制定本监理规划,以指导监理工作的顺利开展。1.工程项目概况滁汊路(二期)改建工程位于新建的滁州承接产业转移示范园区之内,是核心区组团、水口组团和汊河组团之间联系的重要通道。同时也是《交通运输“十二五”发展规划》中重点改造的四射两纵当中的一条重要线路其现状道路等级为二级公路,且在滁州市区段穿城而过。G104二期为一级公路新建工程,位于安徽省东部,总体呈为西北至东南走向,本项目划分为两个合同段,第一合同段起讫桩号K29+810~K35+700,全长5.89km,技术等级为一级公路,双向8车道。其中起点至K30+246.706终点设计时速60km/h,限速50km/h,以便和一期合理衔接,其余路段设计时速80km/h。第一合同段整体路基长5.576km,桥梁长度314m,填方数量90.399万立方米,挖方数量19.126万立方米,圬工数量0.414万立方米,沥青混凝土数量166.392千平方米。第二合同段起讫桩号K35+700~K42+767.225,全长7.067km,技术等级为一级公路,双向8车道。其中K42+123.351至终点设计时速60km/h,限速50km/h,以便和一期合理衔接,其余路段设计时速80km/h。第二合同段整体路基长7.047km,桥梁长度20m,填方数量90.172万立方米,挖方数量70.248万立方米,圬工数量3.601万立方米,沥青混凝土数量217.622千平方米。监理起止桩号为K29+810~K42+767.225,全长12.957公里。2.监理工作范围安徽虹桥交通建设监理有限公司3G104滁州至汊河改建工程(二期)监理计划2.1受建设单位委托,对本道路的路基、路面、排水、桥梁涵洞等工程的施工全过程的“质量、费用、进度控制和施工合同、安全与信息管理及组织协调”。2.2建设单位委托其它服务3.监理工作内容:各标段受监工程都需按以下内容实施监理:3.1质量控...