施工组织方案编制:审核:批准:编制日期:年月日审批日期:年月日第1页共191页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共191页目录1.编制依据.............................................02.工程概况............................................132.1工程概述.........................................132.2建筑概况.........................................132.3结构概况.........................................142.4专业概况.........................................152.5工程特点.........................................163.施工部署............................................173.1施工总体目标...................................173.1.1质量目标....................................173.1.2安全目标....................................173.1.3工期目标....................................173.1.4文明施工及环保目标......................173.2施工组织机构...................................183.2.1施工组织机构设置........................183.2.2项目经理部主要人员的岗位职责.......193.3施工部署原则...................................253.3.1在时间上的部署原则——季节施工的考虑.......................................................253.3.2在空间上的部署原则——立体交叉施工的考虑................................................253.3.3总施工顺序上的部署原则...............253.3.4在资源上的部署原则——机械设备的投入.......................................................263.3.5依基础、结构、装修三阶段施工特点安排总体施工部署....................................263.4工程施工总进度控制计划.....................273.4.1施工阶段目标控制计划..................273.4.2施工总控进度计划表.....................273.5施工组织协调...................................273.6主要劳动力计划................................283.8工程的施工段划分.............................29第2页共191页第1页共191页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共191页3.8.1流水段划分原则..........................293.8.2流水段的具体划分........................303.9垂直运输.........................................303.9.1塔吊.........................................303.9.2人货电梯及井架..........................304.施工准备............................................314.1技术准备.........................................314.1.1相关技术文件的学习、熟悉和落实....314.1.2施工组织设计及施工方案的编制.......314.1.3试验计划...................................324.1.4样板、样板间计划........................334.1.5新技术应用计划..........................344.2生产准备.........................................354.2.1现场临水系统.............................354.2.2现场临电系统.............................364.2.3临时道路及围墙..........................384.2.4生产生活临时设施........................384.3施工机具准备...................................384.4劳动力准备......................................384.5物资准备.........................................384.6施工总平面图布置.............................394.6.1施工总平面布置的原则..................394.6.2施工总平面布置的步骤及内容.........395.主要工程的施工方法及施工技术措施.........405.1工程的施工定位及测量、放线...............405.1.1平面控制...................................415.1.2高程控制...................................415.1.3竖向控制...................................415.1.4技术依据和施工测量设备...............415.1.5垂直度的投测:..........................425.1.6主体工程的施测作法.......