某项目防洪评价报告(送审稿)XX勘测设计研究院北京分院二〇一七年三月某项目防洪评价报告批准:核准:校核:编制:目录1基本情况...............................................................31.1建设项目概况........................................................31.2评价依据............................................................51.3技术路线及工作内容..................................................62基本情况...............................................................82.1建设项目概况........................................................82.2河道基本情况.......................................................122.3现有水利工程及规划实施安排.........................................153河道演变..............................................................163.1河道历史演变概况...................................................163.2河道近期演变分析...................................................193.3河道演变趋势分析...................................................193.4河道演变分析结论...................................................224防洪评价计算..........................................................244.1水文分析计算.......................................................244.2漂流工程河道水面线分析计算.........................................264.3漂流工程河道行洪影响...............................................284.4冲刷分析计算.......................................................294.5河势影响分析.......................................................315防洪综合评价..........................................................325.1漂流工程布置评价...................................................325.2漂流工程防洪安全评价...............................................325.3与现有水利规划的关系与影响分析.....................................335.4与现有防洪标准、有关技术要求和管理要求.............................335.5对河道泄洪的影响分析...............................................335.6对河势稳定的影响分析...............................................345.7对防洪、河道整治及其他水利工程与设施影响分析.......................345.8对防汛抢险的影响分析...............................................345.9对第三人合法水事权益的影响分析.....................................356工程影响防治与补救措施................................................367结论与建议............................................................387.1结论...............................................................387.2建议...............................................................39第5页共39页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第5页共39页1基本情况1.1建设项目概况1.1.1地理位置某项目位于XX县XXX村,项目区位于东经118°18′58″,北纬41°16′24″,属XX河X沟川上游。坝址以上控制流域面积33.9km2,X沟河XX段的峡谷区域。主流长度7.2km,河道坡降29.05‰。该选址区域具有地理位置、环境景观、道路交通等多方面的优越条件,有极大的发展优势。某项目项目位于XX河一级支流X沟河支流东X沟河上游XX村附近,距XX县城60km,距XX市75km,距XX市区130km,XX、XX公路(国家二级公路)由此穿过,XX至XX村村通公路位于河道左岸,交通便利。工程位置见图1-1。图1-1某项目项目工程位置图1.1.2项目前期工作情况2014年11月XX开发有限公司完成了《XX县XX乡水环境工程项目建议书》,并通过审查。2015年1月XX旅游规划设计有限公司完成了《XX县XXX水库XX项目项目可行性研究报告》,并通过审查。2015年6月XX电勘测设计研究院XX分院完成《XX县XX水库工程初步设计报告》...