预应力空心板施工方案目录一、工程概况·······································································0二、施工组织安排和进度计划··················································0三、工程所用材料···········································错误!未定义书签。四、空心板施工工艺······························································3五、施工技术措施·································································6六、质量保证体系·································································8七、安全文明施工及环保要求··················································9八、竣工资料····································································10一、工程概况本工程空心板厚度为300mm,空心率43%,折算厚度为171mm.因为跨度较大,为增强结构的抗震性能及增强耐久性,设计时在板的主受力方向采用了无粘结预应力结构形式。全部预应力钢筋采用1860Mpa、直径15。2mm的低松弛钢绞线,设计张拉控制应力为1395Mpa.预应力筋为一端锚固、一端张拉.预应力筋张拉端设在柱后或者梁侧,无论何种形式,竣工时所有预应力筋的张拉端锚具均应埋在混凝土内,不外露。轻质管由轻质多孔材料生产而成,本工程中为了最大限度减轻结构自重,采用带加强及隔离层的聚苯乙烯泡沫塑料填充。聚苯泡沫塑料自熄阻燃,密度为16kg/m3。二、施工组织安排和进度计划2.1预应力空心板分包施工内容范围1.提供预应力成套技术的施工组织设计等。2.提供预应力成套技术所需的预应力筋、锚具及相应配件,根据预应力施工组织设计进行预应力筋及专用马凳的加工制作,并且负责运至施工现场。3.负责预应力筋的铺放、张拉端节点的安装并负责预应力筋的张拉。4.提供工程所需的轻质管,并且运至施工现场,负责轻质管的安装及抗浮处理。5.进行预应力分项施工的质量监督和检查验收、服从监理公司的监督管理.6.预应力筋及锚具应符合《预应力混凝土用钢绞线》(GB/T5224-2003)、《预应力筋用锚具、夹具和连接器"(GB/T14370—2000)》等有关规定.7.严格按设计图纸、相关规范与规程进行预应力施工,在不同施工阶段提供相应技术资料,并在结构验收时将各种预应力资料整理齐全,报总包、监理公司。2。2总包单位配合内容1.提供预应力部分的图纸、张拉前混凝土强度试验报告、和施工进度计划(指与预应力有关结构部分的支模、绑扎钢筋、浇混凝土的时间安排)。2.提供现场办公用房和机具存放库房一间。3.负责解决预应力筋张拉用操作平台和张拉设备用电源(380V、15A),能承担现场最大2台750W张拉千斤顶油泵的用电负荷。操作平台可以利用原有的脚手架,有必要的安全防护措施,应保证在预应力张拉端后1米范围内没有影响张拉的障碍物,张拉工人有足够摆放机具及张拉操作空间。4.提供施工现场预应力材料的装卸、下料和临时堆放的场地.5.在模板的制作和安装时应根据预应力施工组织设计的要求进行,以满足预应力施工工艺的要求。6.根据预应力施工组织设计进行预应力筋张拉后张拉端的混凝土封堵。7.负责协调安排好各工序、工种间的关系。8.在预应力部位支模前三天通知预应力筋进场铺放,准备张拉前三天通知进场张拉,张拉前一天提供张拉部位混凝土强度报告单.2。3预应力空心板施工岗位职责预应力空心板施工人员由技术负责人、施工工长、质检员、安全员及材料员组成.其中管理人员比例不低于总人数的10%,工程师都具有4年以上的预应力空心板施工经验;施工工长具有3年以上...