目录1.编制依据.......................................................................12.工程概况.......................................................................13.施工部署.......................................................................13.1施工部署原则................................................................13.3质量目标....................................................................23.4劳动组织....................................................................23.5施工段划分..................................................................23.6工期安排....................................................................23.7施工重难点分析..............................................................24.施工准备.......................................................................24.1材料准备....................................................................24.2机具准备....................................................................34.3施工条件准备................................................................34.4技术准备....................................................................44.5标准击实试验................................................................44.6现场碾压试验................................................................44.7人员准备....................................................................55.主要施工技术措施...............................................................55.1施工工艺....................................................................55.2操作工艺....................................................................55.3雨期施工....................................................................76.质量保证措施...................................................................87.工程质量通病防治措施...........................................................98.成品保护措施...................................................................99.安全文明施工措施..............................................................1010.环保措施.....................................................................11土方回填施工方案1.编制依据《建筑工程施工质量验收统一标准》GB50300-2001《建筑地基基础工程施工质量验收规范》GB50202-2002《建筑地面工程施工质量验收规范》GB50209-2002《建筑机械使用安全技术规程》JGJ33-2012《建筑施工安全检查标准》JGJ59-2011新建访仙卫生院病房楼、门诊楼、附属用房工程施工图纸2.工程概况新建访仙卫生院病房楼、门诊楼、附属用房工程总建筑面积为11146m2(其中病房楼建筑面积为4983m2,门诊楼建筑面积为4380m2,附属用房建筑面积为1783m2,)病房楼框架结构五层;门诊楼框架二层,局部三层;附属用房框架三层,局部一层。本工程考虑现场实际情况及现场的场容场貌,根据基础结构因素及场地现状,为确保土方回填施工质量,考虑基础梁结构的安全问题,采用6%灰土回填,分层人工夯实的施工方法。目前,根据现场施工条件,各分项施工满足设计及规范要求,具备回填施工条件后再开始回填土方。3.施工部署3.1施工部署原则本工程土方回填根据质量目标及施工特点,为满足施工工期要求,必须合理解决好质量与工期的矛盾,以安全、质量管理为重点,严格把关,并且采取有效的技术措施,合理安排施工工期,力求多、快、好、省地完成工程施工任务。3.2施工部署及施工顺序本工程基础土方回填总的施工部署为按区域、按土方回填范围分层回填的施工顺序进行,为适应主体结构施工,为满足建筑物回填需要;要求土方回填作业须连续进行。土方回填采取如下方案进行,即土方回填区域集中堆放,基础梁下土方回填采用...