NorthstarFlatRoofAdhesive北星平面屋顶用胶水StarStukFlatRoofingAdhesiveisanindustrialgradesprayadhesiveformulatedspecificallytobondflatroofingmaterials.StarStuk为工业级喷施胶水,专门用于平面屋顶材料的粘接。Itisafastdryingformulaandhasexcellenthighcoverage.它干燥快,覆盖度很高,Ithasgoodmoistureandweatherresistanceagainstextremetemperatureexposure(110DegreesC).在极端气温环境(110°C)下具有良好的抗湿气和抗高温性能。Fastsetuptime1-5minuteswithampleopentime20minutes(dependingontemps).干燥快,为1-5分钟,开放时间长,为20分钟(取决于现场温度)NorthstarSpraySystemAdvantagesavingtimeandlabor本系统能够节省时间和人工80sqmoftwosidedcoverage能够喷涂的面积(两面)达到80m²WindUpliftReport-TestInformation具备抗风揭报告-测试数据Simpleinstallationattachingadedicatedhoseandguntoavalve.安装简单,只需把专用软管和喷枪与阀门连接即可。STARSTUKSPRAYSYSTEMPROCEDURESTARSTUK喷胶系统操作步骤Drytimeisapproximately1to5minutesandopentimeisapproximately5-20minutesafterapplicationdependinguponenvironmentalconditions.干燥时间约1-5分钟,开放时间约5-20分钟,视现场环境而定Twosidedapplicationsubstrateandmembrane对基体和卷材的表面喷胶Sprayabout10-24cmfromsurfaceawayfromthesurface,applyingauniformcoatofadhesive.喷嘴与施工表面的距离为10-24cm,均匀地喷涂胶水层。1coatspersidedependingonneed每个面喷一道,视需要而定CrossSprayPatterns以十字交叉方式喷胶,即一个面横着喷,另一个面竖直喷。Allowtheadhesivetodryuntiltacky,adhereflatroofingmaterialthenapplysufficientpressuretoensurecompletecontactrollingthesprayedmembraneontothesprayedsurface.让胶水自然干燥至略粘手,将喷好胶水的卷材滚放在喷好胶水的基面上使两者粘接,再用力压实确保其完全接触。HowtoSpray喷胶CrossSpray交叉喷胶TackinessTest粘手测试RollMembranewithpressure压滚铺贴卷材APPLICATIONREQUIREMENTS/PROCEDURES施工要求/程序Makesurethatsurfacesareclean,dryandfreefromdirt,dust,oil,loosepaint,waxorgrease,etc.确保施工面的清洁、干燥,无尘土、油滴及松脱的涂料、蜡或油脂等Forbestresults,thetemperatureoftheadhesiveandthesurfacesbeingbondedshouldbebetween16degreesCand27degreesC,为了达到最佳效果,胶水的温度和待粘接表面的温度应介于16-27°CSSFlatRoofAdhesivescanbeusedincolderorwarmerclimates,justneedtotestopentimeanddryingtimetoensureproperworkpace.本胶水可以用于较冷或较热的气候环境,只需试验开放时间和干燥时间以保证合适的施工进度。Usewithadequateventilation.应在通风良好的环境下使用Werecommendshakingthecanisterwellbeforeusing.建议在使用前将胶水罐摇一摇Attachandsecuretightlythehose6ft.or12ft.(EH06orEH12)tothespraygunwith9501tip.将6英寸或12英寸软管与带有喷头的喷枪连接好。Attachtheotherendofthehoseontothecanister.Makesurethehose-valveconnectionsareairtight.将软管的另一端接到胶水罐上,确保连接处不漏气。Openthevalveonthecanisterslowlyandfully.缓慢打开胶水罐上的阀门至全开位置Sprayabout10cm–22cminchesawayfromthesurface,at90°,applyingauniformcoatofadhesive(seepictureonfollowingpage).喷头距施工表面为10-22cm,垂直喷胶,形成均匀的胶水层(见下页)Allowtheadhesivetodryuntiltacky,adhereflatroofingmaterialthenapplysufficientpressuretoensurecompletecontact.待胶水干燥至略粘手状态,铺贴卷材,再用力压实,确保表面完全接触。Leavethehoseandspraygunattachedtothecanister,leavethevalveonthecanisteropen.Donotdisconnectthehose/gunfromthecanister.Closeandlockthespraygun.保持软管和喷枪与胶水罐相连,保持胶水罐阀门开启。勿将软管和喷枪与胶水罐断开,关闭并锁住喷枪。...