深圳某一期工程出库区顶板拆除施工方案编制人:审核人:审批人:深圳市XXX工程有限公司二0一八年六月二十六深圳某项目一期出库区顶板拆除施工方案目录一、工程概况..............................................................................................................31。1施工范围...............................................................................................................41。2施工内容......................................................41.4本工程的一些主要特点和难点分析.................................5二、编制依据..............................................................................................................8三、施工计划..............................................................................................................103.1施工组织......................................................103。2施工队伍.....................................................103。3施工顺序.....................................................103.4施工进度安排..................................................113。5机具准备.....................................................113.6圆盘锯主要技术参数............................................113.7金刚石绳锯机工作性能..........................................11四、施工工艺技术......................................................................................................124.1技术准备......................................................124。2施工程序.....................................................134。3施工方法.....................................................13五、施工安全保证措施..............................................................................................225。1施工安全目标.................................................225.2施工安全检查工作程序..........................................22六、施工管理及作业人员配备和分工....................................................................226.1项目经理的安全管理职责........................................226.2安全主任的安全管理职责.......................................236。3安全员的安全职责............................................23七、验收要求..............................................................................................................247。1验收标准.....................................................247。2监测监控措施.................................................26八、应急处理措施......................................................................................................278。1应急预案的方针和原则.........................................278.2突发事件、紧急情况及风险分析..................................27深圳某项目一期出库区顶板拆除施工方案8。3安全防护措施.................................................278.4应急组织机构..................................................318.5应急处理措施..................................................338。6安全事故救援路线.............................................34九、计算书及相关施工图纸....................................................................................369。1梁(600×1500mm)模板及支架验算...............................369.2板模板及支架验算.............................................419.3外架临时防护验算..............................................52十、项目部相关人员名单...............................................................................