公路工程建设项目交工检测方案工程名称:XX市XX大道南延线近期方案工程施工委托单位:XX建设集团有限公司工程地点:总页数(不含封面):共10页XX市XX区建设工程质量安全监督检测中心二○年月日第1页共10页目录一、工程概况······················································································2二、检测依据······················································································2三、检测方案······················································································3四、主要仪器设备················································································4五、拟投入的主要人员··········································································5六、协调和组织人员·············································································5七、进度安排及其他·············································································6(一)综合安排·············································································6(二)项目实施期间应急预案···························································6(三)文明检测承诺·······································································6(四)项目保密和保护所有权程序····················································6(五)废弃物管理措施···································································7XX市XX大道南延线近期方案工程施工工程交工检测方案第2页共10页一、工程概况本项目位于XX西北部的乐从镇,是对现状樵乐路进行拓建辅道,考虑到充分利用现状旧路及避免拆迁,平面线形与现状樵乐路主线保持一致,不再另开通道,路线总体呈南北走向,起点与正在建设的XX大道二期工程终点衔接,与樵乐路相交后向东延伸与环镇西路相交后,路线转向南延伸,利用现状环镇西路,终点与XX一环南线相交,路线全长4.57km。采用一级公路兼顾城市道路功能,双向六车道,设计速度80km/h;辅道参照城市次干路标准进行设计,双向四车道,设计速度40km/h;现状环镇西路呈南北走向,连接鹭杏线与XX一环南线,环镇西路为已建城市主干路,设计速度为60km/h,双向六车道,路面为沥青混凝土路面,建成时间约1年,路况基本良好,本次施工直接利用现状环镇西路,并维持现状城市主干路标准,仅对其局部进行改造。本次改造主要针对樵乐路辅道、樵乐路与环镇西路交叉口、XX一环与环镇西路交叉口进行整治。共有大桥1座,中小桥2座,人行天桥1座。樵乐路主路起止里程为K21+930.656~K23+261.899,桩号方向为东往西,乐从往西樵方向,与本项目辅道桩号方向相反。左幅道起点里程为LK0+000(=主路K23+056.979),终点里程为LK1+132.184(=主路K21+930.656);右幅道起点里程为RK0+000(=主路K23+056.979),终点里程为RK1+120.478(=主路K21+9...