小型预制构件施工组织设计目录一、编制依据······································2二、编制范围······································2三、工程概况······································2四、施工机械组合、施工人员配备····················3五、施工计划······································3六、施工准备······································4七、施工工艺及施工方法····························4八、质量控制要点·································6九、质量保证措施··································8十、安全保证措施··································9十一、环保措施····································13十二、附表········································14十三、附图········································16一、编制依据1、务川至正安高速公路WZTJ-4合同段招标文件、工程设计图纸等。2、交通部颁布的现行设计、施工规范及其他相关文件。3、国家及有关部委颁布的法规及标准。4、我单位拥有的技术成果、施工工法、管理水平、技术装备及多年积累起来的施工经验。5、编制技术规范与标准《公路工程技术标准》(JTGB01-2003)《公路桥涵施工技术规范》(JTJ041-2000)《公路工程质量检验评定标准》(JTGF80/1-2004)二、编制范围该方案适用于务川至正安高速公路WZTJ-4涵洞盖板、拱形骨架、排水沟及路基附属小型构件预制施工,施工里程为K75+270~K80+,全长公里三、工程概况本标段为贵州省务川至正安高速公路WZTJ-4合同段,位于贵州省遵义市正安县俭坪乡境内,主线起讫里程为K75+270~K80+,全长。拱形骨架护坡防护主要位于右幅YK77+889~YK77+927、YK78+347~YK78+365、YK78+388~YK78+405、YK79+530~YK79+547、YK80+140~YK80+368,左幅ZK79+555~ZK79+567段,砼共计3。钢筋砼盖板涵两道,位于YK80+120、YK80+处,预制盖板工程数量m3。排水沟混凝土预制块工程量:主线路基m3,隧道排水沟预制盖板及电缆沟预制盖板975m3,蹬岭岗隧道780m3、马河隧道95m3、龙泉寺隧道100m3。预制块包括拱形骨架护坡预制块、涵洞预制盖板、路基排水沟预制盖板、隧道中心排水沟预制盖板、隧道电缆沟预制盖板等。预制构件设计标号为拱形骨架护坡C25砼、主线路基排水沟盖板C30砼、涵洞盖板C30砼、隧道排水沟盖板及电缆沟盖板C30砼。预制场设置于我标段K80+280~K80+360段填方路基上,场地建设面积为2100m2。四、施工机械组合、施工人员配备1、组织机构及人员配备我项目部按照合同要求组织相关人员、机械、试验仪器已全部进场,并确定其职责、人员分工。(1)、项目经理制定全面、科学而合理的施工方案,并抓好具体落实工作。(2)、总工程师制定施工方案,并对技术、工艺、质量、进度进行把关控制,向技术人员进行交底。施工投入的人员数量表序号名称姓名数量(人)1项目经理王举12项目总工粟学平13专业工程师张基进14技术人员何健、段永杰27施工工人58杂工5合计152、机械设备配置根据工程量和施工工期要求,投入如下机械设备:机械设备配置表序号机械名称单位数量1钢筋调直机台12钢筋弯曲机台13钢筋切断机台14振动台套25小推车台36定型模板套200五、施工计划计划开工日期:2013年10月01日计划完工日期:2014年12月01日进度安排:工作班制度分为一班,计划量产后每天产量为200块。六、施工准备1、场地准备小件预制采用集中预制,预制场地位于我标段标尾T梁预制场末端K80+280~K80+360填方路基上,在路基回填至设计标高后进行平整、用混凝土硬化,按要求划定钢筋加工制作区、材料存放区、预...