AGREEMENT OF BOT PROJECTThis Agreement is made and entered into by and between The government of_____________(hereinafter called “ B”) representedby________(hereinafter called “ A”)And __________Corporation , a company duly organized and existing under thelaws of the People?s Republic of China with its principal officeat___________(hereinafter called “ C”)。Whereas, A and C concluded the Memorandum Concerning __________Project on the ____________and C had been given Exclusive Right from B to carry out investigation and implement ____________Project (hereinafter called“the Project”) by way of joint financing between C and B (so called BOT)。Whereas, the loan agreement, guarantee agreement, letter of guarantee,etc. shall constitute integral components of this Agreement. The Project?s installed capacity is __________. Now therefore, the parties hereby agree as follows:1. Definition and Interpretation “ Project” means the planning, feasibility study , design and engineering,construction, equipping, completion, testing, commissioning and operation of the infrastructure project. “ Project Cost” means the cost specified in Clause 3.“ Operation Period” means the period specified in Clause 10.1 from the starting date of commercial operation of the infrastructure project. “ Completion Date” means the day upon which C certifies that the infrastructure project has successfully completed its testing and can start Operation Period. “ Force Majeure” shall have the meaning specified in Clause 16.“ Project Scope” means the scope of supply and services of C in connection with the execution of the Project as described in Annex 2. “ Site” means the site for the infrastructure project including ________...