土钉设计土钉处主动土压力计算:第 1 点最大主动土压力根据公式:aaaKcKhqe2e1.2=(20+18×1.2 )× 0.7-2 ×10×0.84=12.51(kPa) e2.4=(20+18.0 ×2.4) ×0.7-2 ×10×0.84=27.72(kPa) e3.6=(20+18.0 ×2.5+19.4 ×1.1) ×0.71-2 ×20×0.85=27.86(kPa) e4.8=(20+18.0 ×2.5+19.4 ×2.0+19.7 ×0.3) ×0.34-2 ×10×0.59=26.03(kPa) e6.0=(20+18.0 ×2.5+19.4 ×2.0+19.7 ×1.5) ×0.34-2 ×10×0.59=47.73(kPa)1. 折减系数计算245tan/tan12tan12tan02kkk-土钉墙坡面与水平面夹角,为03.73(坡度 1:0.3 )。018.385.329.229.65.210)18.3/245(tan/3.73tan12103.73tan1)2103.73tan(210.96)18.3/245(tan/3.73tan12103.73tan1)2103.73tan(2296.0)18.3/245(tan/3.73tan129.63.73tan1)29.63.73tan(23.990)18.3/245(tan/3.73tan1229.23.73tan1)229.23.73tan(2439.0)18.3/245(tan/3.73tan1229.23.73tan1)229.23.73tan(2539.02. 受拉荷载标准值计算cos/yxaisseT其中:-荷载折减系数;aie -第 i 个土钉位置处的基坑水平荷载标准值, (kPa);xS 、yS --- 土钉与相邻土钉的平均水平、垂直间距, (m);--- 土钉与水平面的夹角。c o s/111yxasseT =0.96×12.51 ×1.2 ×1.2/cos150 =17.9 c o s/222yxasseT =0.96×27.72 ×1.2 ×1.2/cos150=39.67 c o s/333yxasseT =0.99×27.86 ×1.2 ×1.2/cos150=41.12 c o s/444yxasseT =0.39×26.03 ×1.2 ×1.2/cos150=15.1 c o s/555yxasseT =0.39×47.73 ×1.2 ×1.2/cos150 =27.75 3.土钉受拉承载力设计值计算土钉受拉承载力设计值按以下公式计算:jujTT025.1其中:iT --- 第 i 根土钉受拉荷载标准值, (kN);ujT --- 第 i 根土钉受拉承载力设计值, (kN);0 --- 基坑侧壁重要性系数,取1.0 。kNTTu22.3817.90.125.125.1101kNTTu49.5939.670.125.125.1202kNTTu4.5112.410.125.125.1303kNTTu18.8815.10.125.125.1404kNTTu34.6927.750.125.125.15054. 土钉长度设计土钉长度按以下公式计算:sikujsujiqdTl其中:s --- 土钉受拉抗力分项系数,取1.3 ;ujd--- 第 j 根土钉锚固体直径,(m);sikq--- 土钉穿越第 i 层土体与锚固体极限摩阻力标准取值;查表得kPaq sik451,kPaqsik542,kPaq sik453,kPaq sik554kPaq sik555。il --- 第 i 根土钉在直线破裂面外穿越第i 稳定土体内的长度 ,(m) 。mqdTlsi...