C建 筑 及 土 建 工 程Building & Civil Works 16,601,761.76 C1.00地坪土方工程Flooring Earthworks - -C1.01场地平整Levelling of the landm2 - - - - - 3.00 -incl.C1.02Setting Out放样m2 - - - - - 1.50 -incl.C1.03土方开挖Excavation of basic Earthworkm3 - - - - - 25.68 -incl.C1.04土方外运堆及推平Earthwork Remove Away from & Levellingm3 - - - - - 65.00 -incl.C1.05Compaction on Backfill Layer at 150mm thkper layer (Factor 0.95)回填地面土压实按150mm厚每层 (系数0.95)m2 - - - - - 19.00 -incl.C2.00地坪工程Flooring Works - 4,891,066.24C2.01放样Setting Outm2 - - - - - 3.00 -incl.C2.02回 填 场 地 平 整Ground Levelingm2 - - - - - 1.50 -incl.C2.03Compaction On Original Soil Layer (Factor0.95)原有地面土压实 (系数0.95)m2 16,370.00 1,630.00 438.00 222.00 18,660.00 2.80 52,248.00C2.04Original Soil Compaction Test (Min 500m²/1Test)原土土方压实测试 (最少500m²/一次测试)lot 33.00 4.00 1.00 1.00 39.00 150.00 5,850.00C2.05300mm thk Crusher Run300mm厚级配碎石m3 4,856.10 2.10 25.05 - 4,883.25 182.40 890,704.80C2.06Compaction on Gravel Layer at 150mm thickper layer (Factor 0.95)碎石基层压实按150mm厚每层 (系数0.95)m3 - - 19.00 -incl.C2.07Gravel Compaction Test (Min 500m²/1 test)碎 石 基 层 压 实 测 试 (最 少 500m²/一次测 试 )lot 33.00 4.00 1.00 1.00 39.00 300.00 11,700.00C2.08200mm thk C35 Concrete200mm厚C35 混凝土m3 3,227.00 - - - 3,227.00 506.30 1,633,830.10C2.09Ø 8 钢筋@200x200双层双向Reinforcement Bar Ø 8 @ 200x200 DoubleLayer both directionkg 149,492.00 - - - 149,492.00 5.39 806,135.61C2.10Formwork to Slab地坪模板m2 491.10 48.90 13.14 6.66 559.80 60.00 33,588.00C2.11Additional Steel Reinforcement Bar atManhole Openings or other Floor Recesses人孔开口或其他楼板通道处钢筋加固kg 180.00 - - - 180.00 5.39 970.65C2.12Additional Steel Reinforcement Bar aroundColumn柱子周...