C建 筑 及 土 建 工 程Building & Civil Works 16,601,761
00地坪土方工程Flooring Earthworks - -C1
01场地平整Levelling of the landm2 - - - - - 3
00 -incl
02Setting Out放样m2 - - - - - 1
50 -incl
03土方开挖Excavation of basic Earthworkm3 - - - - - 25
68 -incl
04土方外运堆及推平Earthwork Remove Away from & Levellingm3 - - - - - 65
00 -incl
05Compaction on Backfill Layer at 150mm thkper layer (Factor 0
95)回填地面土压实按150mm厚每层 (系数0
95)m2 - - - - - 19
00 -incl
00地坪工程Flooring Works - 4,891,066
01放样Setting Outm2 - - - - - 3
00 -incl
02回 填 场 地 平 整Ground Levelingm2 - - - - - 1
50 -incl
03Compaction On Original Soil Layer (Factor0
95)原有地面土压实 (系数0
95)m2 16,370
00 1,630
00 438
00 222
00 18,660
80 52,248
04Original Soil Compaction Test (Min 500m²/1Test)原土土方压实测试 (最少500m²/一次测试)lot 33