郑东新区热电有限公司一期2×200MW 机组工程 电动给水泵调试方案 河南第一火电建设公司调试所 -1- 编号:8080-HNHY-TSJ-A05-008 河南第一火电建设公司调试所 调试作业指导书 工程名称:郑东新区一期2×200MW机组工程项目名称:电动给水泵调试方案方案 编制单位:河南第一火电建设公司调试所 出版日期:2007年07月05日 郑东新区热电有限公司一期2×200MW 机组工程 电动给水泵调试方案 河南第一火电建设公司调试所 -2- 工 程 名 称 郑东新区热电厂一期2×200MW 机组工程 文 件 名 称 电动给水泵调试方案 文 件 类 别 分系统试运 批 准 年 月 日 审 核 年 月 日 编 制 年 月 日 郑东新区热电有限公司一期2×200MW 机组工程 电动给水泵调试方案 河南第一火电建设公司调试所 -3- 目 录 1 目的···························································································(04) 2 依据···························································································(04) 3 设备系统简介···········································································(04) 4 调试内容及验评标准·······························································(05) 5 组织分工··················································································(05) 6 使用仪器设备··········································································(06) 7 调试应具备的条件··································································(06) 8 调试步骤································...