目 录一、编制依据.....................................................2二、分项工程概况.................................................2三、施工安排.....................................................33.1 进度计划安排................................................33.2 施工现场安排................................................33.3 劳动力安排..................................................4四、施工准备.....................................................44.1 技术准备....................................................44.2 机械、用具准备..............................................54.3 材料准备....................................................6五、施工方法.....................................................6六、加气混凝土砌块施工方案......................................22七、墙体布置与构造..............................................24八、砌筑前准备工作与验收要点....................................26九、为保证粉刷时墙休不开裂,粉刷施工与验收要点..................30十、成品保护措施................................................32十一、安全注意事项:............................................33十二、环保措施:................................................33一、编制依据1.1、福泰花园普通商品房住宅小区一期 1.1 楼施工组织设计。1.2、福泰花园普通商品房住宅小区一期 1.1 楼施工图纸及图纸会审记录设计交底、洽商。1.3、《建筑工程施工质量验收统一标准》 GB50300-2001。1.4、河北标《住宅厨房卫生间防火型变压式排气道》 J09J1011.5、《砌体填充墙结构构造 》 12G614-1 1.6 、《砌体结构工程施工质量验收法律规范》 GB50203-2024。1.7、《建筑物抗震构造详图》 11G329-1;1.8、《混凝土结构工程施工质量验收法律规范》 GB50204-2024(2024 版)1.9、《混凝土后锚固技术规程》 JGJ145-20241.10、《建筑装饰装修工程验收法律规范》 GB503210-2024 1.11、《关于加强混凝土结构工程中填充墙砌体(二次结构)工程质量控制的通知》大建自[2024]13 号。 1下载后可任意编辑二、分项工程概况福泰花园普通商品房住宅小区一期 1.1 楼工程总建筑面积为 90515.76㎡,由 A-(13、14、15-b)楼、A-(13、14、15-...