挖填%数量%数量%数量%数量%数量%数量总数量土石土石土石土石土石土石土石123456789101112131415161718192021222324252627282930313233345403112000000####路 基 土 石 方 计 算 表道路名称:广花路桩号横断面积(平方米)距离(米)挖方分类及数量(立方米)总数量土石ⅠⅡⅢⅣⅤⅥ填方数量(立方米)利用方数量(立方米)及运距(米)本桩利用填缺挖余远运利用纵向调配利用借方数量(立方米)及运距(米)弃方数量(立方米)及运距(米)总运量(立方米公里)备注K14+24010.73.29K14+25010.33.36K14+270192.01K14+283.922.31.13K14+29520.84.13K14+3209.5216.9K14+3507.4219.3K14+3704.2135.4K14+4001.4367.8K14+4302.2818.2K14+4600.5825.6K14+4808.3822.7K14+4950105K14+51533.4112K14+5246.39150K14+56021.389.5K14+564.23.59174K14+5720298K14+5800219K14+5920.21142K14+6200.64134K14+6500150092.6K14+6800176K14+7050120K14+780014810105K14+7200164K14+75033.200002029453.7000013.928821.8000011.124029.200002538026300003025454300002011654700003084.6154700003055.7128900003042.865600002089.548300001562.89570000203342173000091791180000036498430800004.252.355300007.814183900008020670000121.26216700002811.938760000309.614274000030048940000250370100001502133000030038500000300360400本页小计00本公里小计路 基 土 石 方 计 算 表道路名称:广花路号横断面积(平方米)离(米)挖方分类及数量(立方米)填方数量(立方米)利用方数量(立方米)及运距(米)借方数量(立方米)及运距(米)弃方数量(立方米)及运距(米)总运量(立方米公里)挖填%数量%数量%数量%数量%数量%数量总数量土石土石土石土石土石土石土石12345678910111213141516171819202122232425262728293031323334220224000000####7603335000000####挖填%数量%数量%数量%数量%数量%数量总数量土石土石土石土石土石土石土石12345678910111213141516171819202122232425262728293031323334桩号横断面积(平方米)距离(米)总数量土石ⅠⅡⅢⅣⅤⅥ填方数量(立方米)利用方数量(立方米)及运距(米)本桩利用填缺挖余远运利用纵向调配利用借方数量(立方米)及运距(米)弃方数量(立方米)及运距(米)总运量(立方米公里)备注K14+810093.6K14+829.780136K14+8600123K14+8900109K14+910095.4K14+929.78090.4K14+949.170.4977.2K14+968.561.5768.9K15+00011.136K15+0300.148.6K15+050242.8K15+068.560.21151K15...