最新LEED施工资料新版室内空气质量管理计划-施工期间LEED_IEQC3_IAQManagementPlanVIP免费

最新LEED施工资料新版室内空气质量管理计划-施工期间LEED_IEQC3_IAQManagementPlan_第1页
1/18页
最新LEED施工资料新版室内空气质量管理计划-施工期间LEED_IEQC3_IAQManagementPlan_第2页
2/18页
最新LEED施工资料新版室内空气质量管理计划-施工期间LEED_IEQC3_IAQManagementPlan_第3页
3/18页
室内空气质量管理计划-施工期间IAQ Management Plan-During ConstructionProject Name Client Name Date MM DD YY 2 of 18 Table of Contents 目录1. Goal 目的 . ........................................................................................................................................... 32. Introduction简介 . ......................................................................................................................... 33. Measures方法 . .......................................................................................................................... 34. Supervision监督 ................................................................................................................................ 9Note 备注 : 1. Please correct the red words according within the project. 请根据项目情况修改红色字部分。2. All pictures from sample projects for reference. 所有照片是样板项目照片,仅供参考。References Standards Cited 参考标准:Sheet Metal and Air Conditioning National Contractors Association(SMACNA) IAQ Guidelines For Occupied Buildings Under Construction, 2nd Edition 2007, ANSI/SMACNA008-2008(Chapter 3) 3 of 18 1. Goal目的The management plan is made and enforced for preventing indoor air from pollution during construction period, aiming of maintaining nice indoor air quality and protecting the health of the workers and people who will live in the house in the future. 制定本管理计划和组织相关人员实施本管理计划的目的是保护施工期间室内空气不受污染,以维持舒适的室内空气品质和保护施工者和以后住户的身体健康。2. Introduction简介In order to achieve the goal set, indoor air quality management plan should be made and enforced during the construction period and before people living in. Besides being up to the requirements by the code GB50325-2001 (Code for Pollution Control of Indoor Environment...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

最新LEED施工资料新版室内空气质量管理计划-施工期间LEED_IEQC3_IAQManagementPlan