下载后可任意编辑目 录一、编制说明..................................................41.编制依据....................................................42.编制原则....................................................43.编制内容....................................................44.施工总目标..................................................5二、项目概况..................................................51.工程概况....................................................52.基坑周边环境................................................53.场区岩土工程地质条件.......................................64.场地水文地质条件...........................................75.设计概况....................................................7三、施工组织管理机构........................................101.组建项目经理部............................................102.主要管理人员职责..........................................11四、施工准备.................................................121.施工总平面布置与管理......................................122.现场施工准备...............................................123.技术准备...................................................134.拟投入的主要物质计划......................................135.拟投入的主要施工机械计划..................................146.劳动力计划安排............................................14五、施工顺序安排.............................................15六、主要分部分项工程施工方法................................161下载后可任意编辑㈠支护桩施工.................................................161.钻孔灌注桩施工工艺流程图(图 2)..........................162.主要工序施工方法..........................................173.常见质量通病、关键技术、复杂环节技术组织措施............194.突发事件、应急处理措施....................................20㈡锁口梁施工.................................................16㈢锚杆及角撑施工.............................................21㈣桩顶边坡喷砼及钢板网喷砼施工..............................25㈤排水沟施工............