下载后可任意编辑目 录1.1 概述........................................................................................21.2 搅拌桩与逆拱墙支护结构井施工工艺流程图...........................41.3 搅拌桩与逆拱墙支护结构井施工进度计划..............................41.4 劳动力与主要物资资源的需要量计划.....................................51.5 机械设备计划及安排与调度....................................................61.6 主要材料计划及保证措施.......................................................71.7 材料投入保证措施..................................................................81.8 资金投入保证措施..................................................................81.9 搅拌桩与逆拱墙支护结构井测量放线.....................................91.10水泥搅拌桩施工..................................................................101.11 搅拌桩与逆拱墙支护结构井挖土.....................................131.12 搅拌桩与逆拱墙支护结构井结构制作..............................141.13 搅拌桩与逆拱墙支护结构井封底、底板施工...................181.14 搅拌桩与逆拱墙支护结构井质量要求..............................191.15 搅拌桩与逆拱墙支护结构井质量保证措施.......................19下载后可任意编辑1.1 概述一、搅拌桩与逆拱墙支护结构井概述本工程顶管施工用井(工作井、接收井)结构形式采纳钢筋混凝土搅拌桩与逆拱墙支护结构井、沉井,其中W8 、W9 与W12井结构形式采纳的是沉井,其余12个井一 律 采 纳 圆 形 搅 拌 桩 与 逆 拱 墙 支 护 结 构 井 形 式 ( 5个 工 作 井W4、W17、W21、W26、W31,7个接收井W1 、W6 、W15、W19、W19-1、W24、W28、)。根据本工程实际情况,共设置7 个工作井和8 个接收井。工作井、接收井有矩形沉井和圆形搅拌桩与逆拱墙支护结构井两种。井壁处预留出管道出入口,工作井D2000管穿过预留直径2600mm的孔,D1000管预留直径1400mm孔,接收井D2000管穿过预留直径2800mm的孔,D1000管预留直径1600mm孔,预留孔在顶管机进出洞前用M10砖、MU10 砂浆砌筑封堵,预留孔且要砌筑实,以防井室进水和能更好地承受顶力。搅拌桩采纳Φ500 搭接100mm ,每井采纳两排支护,搅拌桩采纳32.5R 普通硅酸盐...