工程名称:综合单价合价综合单价 合价分部分项工程量清单A.1土(石)方工程13,955.411010101001001平整场地m2154.6305.26813.352 010101003001挖基础土方m3224.54028.956,500.433010103001001土(石)方回填m3242.13027.436,641.63A.3砌筑工程56,384.5710 1 0 3 0 1 0 0 1 0 0 1砖基础m311.340492.815,588.472 0 1 0 3 0 1 0 0 1 0 0 2砖基础m36.690492.813,296.9030 1 0 3 0 4 0 0 1 0 0 1空心砖墙、砌块墙m340.410444.2517,952.1440 1 0 3 0 4 0 0 1 0 0 2空心砖墙、砌块墙m357.040444.2525,340.025 0 1 0 3 0 2 0 0 1 0 0 1实心砖墙m39.470444.254,207.05A.4混凝土及钢筋混凝土工程149,444.01010 1 0 4 0 3 0 0 1 0 0 1基础梁m36.790493.963,353.992 0 1 0 4 0 1 0 0 2 0 0 1独立基础m323.810492.5311,727.1430 1 0 4 0 1 0 0 6 0 0 1垫层m316.720470.917,873.6240 1 0 4 0 2 0 0 1 0 0 1框架柱m317.140544.419,331.195 0 1 0 4 0 2 0 0 1 0 0 2构造柱m315.600640.749,995.546 0 1 0 4 0 2 0 0 1 0 0 3矩形柱m30.750560.74420.56工程量差金额差工程数量合同工程量金额(元)金额(元)工程数量实际工程量工程量清单计价结算表项目名称项目编号序号计量单位差异6 --1工程名称:综合单价合价综合单价 合价工程量差金额差工程数量合同工程量金额(元)金额(元)工程数量实际工程量工程量清单计价结算表项目名称项目编号序号计量单位差异70 1 0 4 0 3 0 0 5 0 0 1过梁m34.520588.932,661.968 0 1 0 4 0 5 0 0 8 0 0 1窗台梁m34.620640.742,960.229 0 1 0 4 0 3 0 0 4 0 0 1止水带m32.630550.151,446.89100 1 0 4 0 6 0 0 1 0 0 1直形楼梯m226.020231.526,024.15110 1 0 4 0 5 0 0 1 0 0 1有梁板m356.270522.3629,393.20120 1 0 4 0 7 0 0 2 0 0 1散水(700)m341.01059.772,451.1713 0 1 0 4 1 6 0 0 1 0 0 1现浇混凝土钢筋(12内一级)t2.8885536.1515,988.4014 0 1 0 4 1 6 0 0 1 0 0 2现浇混凝土钢筋(12内三级)t2.0645536.1511,426.61150 1 0 4 1 6 0 0 1 0 0 3现浇混凝土钢筋(25内三级)t6.8154994.37 34,036.6316 0 1 0 6 0 6 0 0 8 0 0 1钢梯t0.0438203.28352.74A.7屋面及防...