电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

上行式移动模架移位拼装过连续梁的施工方法

上行式移动模架移位拼装过连续梁的施工方法_第1页
1/5
上行式移动模架移位拼装过连续梁的施工方法_第2页
2/5
上行式移动模架移位拼装过连续梁的施工方法_第3页
3/5
下载后可任意编辑上行式移动模架移位拼装过连续梁的施工方法上行式移动模架移位拼装过连续梁的施工方法 刘卓 摘要:本文依托广佛环线 32.6m 跨径连续箱梁施工为例,详细介绍了一种上行式移动模架在过连续梁时一种施工方法,該方法采纳降低移动模架中支腿、前支腿高度,使其坐落到连续梁桥面上的方式,在已浇筑完成的简支梁上拼装,然后再前移通过连续梁到达至制梁现场。此方法相比较于在制梁位置拼装的方法更为安全,直接,经济,可循环。能够完美解决上行移动模架只能原位拼装及遇连续梁无法过跨施工的难题,拓宽了移动模架使用范围。 Abstract: This article relies on the construction of a 32.6m-span continuous box girder of the GuangFo ring line as an example , and introduces in detail a construction method of an upward mobile forming framework when passing through continuous beams. This method uses the method of reducing the height of the legs and the front legs in the mobile formwork so that it sits on the continuous beam bridge surface, and assembles on the simply supported beams that have been poured, and then moves forward through the continuous beams to the beam making site. This method is safer, direct, economical, and recyclable than the method of assembling at the beam-making position. It can perfectly solve the problem that the upward mobile forming framework can only be assembled in situ and cannot cross the construction in case of continuous beams , which expands the use range of the mobile formwork. 关键词:上行式移动模架;过连续梁;现浇箱梁 0 引言 近年来,随着国家在公路、铁路方面的大力度投资建设,移动模架已经作1下载后可任意编辑为一种常用的桥梁设备广泛的应用起来。然而在线路某一标段通常设计有箱梁、连续梁、钢箱拱等诸多梁体形式,按箱梁梁形设计制造的上行式移动模架无法通过连续梁,根据传统在制梁位置拼装移动模架,这势必就会增加施工成本,且此方法较为繁琐,安全风险较高。 利用降低移动模架中支腿、前支腿高度拼装,使其坐落到连续梁桥面上的方式前...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

上行式移动模架移位拼装过连续梁的施工方法

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部