EPCIC OF WELLHEAD PLATFORMS, ASSOCIATEDPIPELINES AND TIE-INSOFZAWTIKA DEVELOPMENT PROJECT PHASE 1BHAZID Terms of ReferenceA121-jun-14Issued for ReviewAPPR.DOCUMENT CLASS: 1CHECKCHECKAPPR.REVDATEBYDESCRIPTIONENGINEERINGAPPROVALCOMPANYAPPROVALREVISION CODE: A = Issued for Review – B = Issued for Approval – C = Approved for Design orApproved for Construction or Issued for Implementation or Issued for Purchase or Issued for PurchaseSpecificationTOTAL OR PARTIAL AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUTPRIOR WRITTEN AUTHORIZATION OF THE OWNERPTTEP INTERNATIONAL LIMITEDEPCIC OF ZAWTIKA DEVELOPMENT PROJECT PHASE 1BREVA11项目概述1.1GeneralThe Zawtika Project is a gas field development project located in the Gulf of Martaban ,Myanmar. The development area covers Block M9 and small portion of Block M11 ,owned by Myanmar Oil & Gas Enterprise (MOGE).The field lies approximately 300km south of Yangon and 290 km west of Tavoy on the Myanmar coast and the averagewater depth is approximately 140-150 meters.Figure 1.1:Zawtika Field LocationZawtika field development is planned in three phases 1A (existing facilities), 1B and1C as per Figure 1.2 Zawtika Field Layout.Phase 1A development consisting ofZawtika Processing integrated with living quarter platform (ZPQ), WP1, WP2,and WP3 is currently being developed. Commercial production is expected tocommence in the first quarter of 2014.Phase 1B and 1C (remote wellhead platforms)will be developed in order to sustain production plateau through the field life.Figure 1.2:Zawtika Field Layout1.2ObjectivesThe intent of the HAZOP review is to systematically review the design and operationsof the WP4/5/7 and WP4 facilitiesand Brown Field modifications of existingplatforms ZPQ, WP2, and...